HomeMy WebLinkAboutC01-232 Cruz Construction change order number 2(... 0 -1- 1,7- - -e_ --- �:, C
CHANGE ORDER NUMBER 2
CONTRACTOR Cruz Construction, Inc.
Contract for 2001 Guardrail Project
Contract Date June 5, 2001
TO: Cruz Construction, Inc.
You are directed to make the changes noted below in the Subject Contract. Appropriations
to cover the costs of additional work have been made.
A OGLE
H
� 0
EAGLE COUNTY BOARD OF COUNTY COMMISSIONERS
Tom C. Stone, Chairman
DATE:`
Nature of Changes: Final adjusting change order
ITEM DESCRIPTION INCREASE DECREASE
1. Additional material required on Frying $968.80
Pan Road as follows: W -Beam Rail,
300 ft @ $2.39/ft; Wood Post & Blocks,
7 each @ $27.40 /each; End Anchor
Buffer, 1 each @ $60.00 /each
These changes result in the following adjustment of ."ontract Price and Contract Time:
Contract Price Prior to this Change Order $98,764.05
Net INCREASE Resulting from this Change Order $ 968.80
Current Contract Price Including this Change Order $99,732.85
Change Order No. —2
Page 2
Contract Time Prior to this Change Order September 15, 2001
Net Resulting from this Change Order No Change
Current Contract Time Including this Change Order September 15, 2001
The above changes are recommended:
The above changes are recommended:
Brad Higgins
Road and Bridge Director
Date:
Peter T. Sulmeiiters
Project Manager
Date:
The above changes are accepted: Cruz Construction, Inc.
T President
Date: 9-7-01
1'IUI:1 CJJ GCJCJI tYJ • JI..1 1 / \UI I VI\UL VUI lv I I-- I ---------
ucTI
s eQaee
tail
4850 Geiger Blvd.
COloredo 8prinps, Colorado $0916
FAX: (912) SMOS26
4
August 9, 2001
Eagle County Board of Commissioners
500 Broadway
Eagle. Colorado
81631 -0850
RE: Eagle County 2001 Guardrail Project
Attn. Peter T. SulmeisWrs
The above referenced project was completed 100% on August 7, 2001. The following Is our invoice.
Original Contract $64,686.06
Change Order a34.07s.0o
Sub Total 698,764.05
Additional material use on 690 ft of ralae rail at the rrying Pan Road.
W Beam Rail 300 ft. $2.39 $717.00
wood Post & Blocks - 7 ea. 2r,40 191 AM
End Anchor Buffer 1 ea. 60.00 MM -
Total Invoice $89,732.85
5incpr•Rly, �
e M. Cruz
President
Cruz construction Inc.
a