HomeMy WebLinkAboutC01-226 design and cost estimate from Holy Cross for Tree Farm BuildingJuly 30, 2001 Mr. Kurt Dierk JUL Eagle County F�C� P.O. Box 850 CITIES MANAGEMENT Eagle, CO 81631 Re: New Building Tree Farm/El Jebel Dear Kurt: We have completed a design and cost estimate for providing electric service to the above referenced project. Our facilities will be installed as shown on the attached sketch. Holy Cross Energy, a Colorado corporation, estimates that the cost of construction will be as follows: Total estimated cost of underground construction $17,000.00 Holy Cross Energy investment secured by enclosed guaranteed monthly minimum revenue contract 0-5,900.00 Contribution in aid of underground construction (nonrecoverable) required before starting work on the project $ 1,100,00 The above figures are only estimates. After the job has been completed, the actual cost of construction will be determined. Your monthly minimum revenue contractual amount will be adjusted to reflect Holy Cross Energy'ss actual investment. Your contribution will be adjusted to reflect actual costs by making a refund or further assessment. Execution of this document constitutes agreement to sign a new monthly minimum revenue contract with the adjusted amount and /or pay any further assessment in a timely manner. The following conditions are hereby noted: Holy Cross Energy has implemented a policy which requires that project owners provide all excavation, backfill, compaction and cleanup needed for installation of the underground power system extension to serve their new development. The owner must also set all vaults and install all conduits as specified by Holy Cross Energy's design for the project and the enclosed construction specifications. Holy Cross Energy will supply all material which can be picked up by the owner at the appropriate storage yard. The cost of this material is included in the job cost estimate. Secondary voltage available will be 208Y/120, three - phase. It will be your responsibility to extend underground secondary entrance conductors from the pad - mounted transformer to points of power usage. U Kurt Dierk July 30, 2001 Page Two 4. All underground services shall be installed in conduit ahead of the meter. All underground services must be in conduit beneath roads, driveways, and other areas of difficult excavation. 5. It shall be the consumer's responsibility to protect their electric equipment from temporary over voltage or under voltage situations resulting from causes beyond the control of Holy Cross Energy. 6. We attempt to complete all projects in a timely manner. However, highest priority is given to maintaining service to our existing consumers. This fact, along with inevitable construction delays, will not allow us to guarantee a project completion date. 7. All Holy Cross Energy rules and regulations will be followed. When Holy Cross Energy is in receipt of your check in the amount of $1,100.00, all necessary executed easements, other permits, if required, a completed "Application For Electric Service" form and the signed original of this letter agreement (below ), the job can be scheduled for construction. If you have any questions, please contact me. Sincerely, HOLY CR( Jeffreyry/nke, Stakinq Engineer )AF: vw Enclosure W/0#01 -17577:70-60: Eagle County Building /Mt. Sopris Tree Farm Franke \Dlerk