HomeMy WebLinkAboutC01-200 Cruz Construction change order 11 CC �U
CONTRACTOR Cruz Construction, Inc.
Contract for 2001 Guardrail Project
Contract Date June 5, 2001
TO: Cruz Construction, Inc.
You are directed to make the changes noted below in the Subject Contract. Appropriations
to cover the costs of additional work have been made.
EAGLE COUNTY BOARD OF COUNTY GQ&dMISSIONERS
s 1
Nature of Changes:
ITEM DESCRIPTION
INCREASE
1. An additional 2,100' of Guardrail, Type
$28,938.00
3, on the Frying Pan Road @ $13.78/L.F.
4. An additional 2 End Anchorages, Type
$ 1,200.00
3E, @ 600.00 /Each
5. Additional Traffic Control at a Lump Sum
$ 3,940.00
rate of $3,940.00
TOTAL
$34,078.00
DECREASE
r} I, .
C
Change Order No. 1
Page 2
These changes result in the following adjustment of Contract Price and Contract Time:
Contract Price Prior to this Change Order $64,686.05
Net INCREASE Resulting from this Change Order $34,078.00
Current Contract Price Including this Change Order $98,764.05
Contract Time Prior to this Change Order September 15, 2001
Net Resulting from this Change Order No Change
Current Contract Time Including this Change Order September 15, 2001
The above changes are recommended:
The above changes are recommended:
Brad Higgins
Road and Bridge Director
Date:
Peter T. Sulmeisters
Project Manager
Date:
Change Order No. 1
Page 3
The above changes are accepted: Cruz Construction, Inc.
Me: President
Date: July 16, 2001
J{.JLCJJ GCJ CJI CJf•JJ
n 5
July 3, 2001
FUNUI "1 1,ISU4- 1-Ul NO I1 u. —11UI4 1141.. IU
C-1
OTICW
COLORAOO
SPRINGS, cot-6--.Oie-
4850 Geiger Blvd,
Colorado Springs, Colorado $0915
(719) SWO226
PAX; (719) 5" 4324
Eagle County Board of County Commissioners
500 Broadway
Eagle, Colorado
81631
RE, Eagle County 2001 Guardrail Project
Attn. Peter s"ulnletsters
17 ('JGO r 10D r' . KJG
Install Cor -ten Guardrail Type 3 with 7 ft, post when necessary on the Frying Pan Road in Eagle County.
Sincerely.
ae M. Cruz
President
Cruz Construction Inc.
AN tQUAL OPPOATUNITY EMPl.OYAR
TOTAL P.02
Unit
Extended
Quantity
Price
Prim
Guardrail Type, 3 °
2100 Ft.
$13.78
$28,938.00
End Anchorage Type 3E
2 Ea.
600.00
1,200.00
Traffic Control
1 L.S.
3940.00
3,840.00
"total This Quote
$34,078.00
Sincerely.
ae M. Cruz
President
Cruz Construction Inc.