HomeMy WebLinkAboutC01-159 First Amendment to Rudd Construction ContractFIRST AMENDMENT TO CONTRACT BETWEEN EAGLE COUNTY, COLORADO AND RUDD CONSTRUCTION, INC. FOR,CONSTRUCTION OF A PUBLIC SERVICE FACILITY AT THE TREE FARM THIS AMENDMENT TO CONTRACT, is made and entered into th s> &day of 2001, by and between the County of Eagle, State of Colorado, through its Board of County Commissioners ( "Eagle County'), and Rudd Construction, Inc. ( "Construction Manager/ General Contractor" or "CM/GC "). RECITALS WHEREAS, Eagle County and Construction Manager/ General Contractor entered into a contract for construction of a public facility at the Tree Farm dated December 18, 2000; and WHEREAS, Eagle County and the CM/GC wish to enlarge the scope of work and adjust the payment under such contract by the amount of $45,000.00; and WHEREAS, the CM/GC has accepted the enlargement of the scope of work under the December 18, 2000 Contract pursuant to the letter attached as Exhibit A; and WHEREAS, Eagle County wishes to accept the contract change from a Guaranteed Maximum Price of $2,400,000.00 to $2,445,000.00 in return for the additional work specified in Exhibit A. NOW, THEREFORE, in consideration of the mutual covenants and promises of the parties hereto, the County agrees to accept the offer of the CM/GC to increase the scope of work outlined in Exhibit A in return for a new Guaranteed Maximum Price of $2,445,000.00. COUNTY OF EAGLE, STATE OF G.4 COLORADO, By and Through It's ATTEST: BOARD OF COUNTY COMMISSIONERS 119 .4 17 17 .4 - 2z- (L,'ferk to the Roardo'f Tom C. �tone County Commissioners Chairman GARAB \Contracts\Rudd Tree Farm 1st amend.wpd Our file 2001 G 009 Page 1 of 1 C! RUDD CONSTRUCTION INC 0132 Park Avenue • Basalt, Colorado 81621 May 14, 2001 Kurt Dierking, Project Manager Eagle County Facililities Management P.O. Box 850, 590 Broadway Eagle. CO 81631 -7720 Dear Kurt: Attached please find the following submissions requested in your letter of May 9/01: - GMP /Estimate - Project Construction Schedule (Ex. B) Contract Time (Ex. E) Allowances (Ex. I) Item #3, "CM /GC Fee Structure and Cost Allocations ", and item '#5, "General Conditions/ General Requirements ", are not applicable at this stage. The estimate is $45,000. above our target GMP of $2,400,000. This is a result of the addition of the following items to the Project Scope of Work: 1. Additional work to complete tie -in to Valley Road $24,000. 2. Additional work to prepare Kitchen for future full service use $ 8,000 3. Other changes, including going to a 2 -stage furnace system. adding fire and smoke dampers in the 'Courtroom/Multi- Purpose Room, relocating the water line, addition of wall tile in the Bathrooms, and adding a flagpole $13,000. Please contact me if you have any further questions. -Yours truly Eric M. Workman, Project Manager C.C. Scott Smith, Reno Smith, Architects Telephone 970/927 -9119 FAX 970/927 -4027 _ RUDD CONSTRUCTION, INC. 0132 PARK AVE. BASALT, CO 81621 Tel: (970) 927 -9119 Fax: (970) 927 -4027 NOTICE TO PROCEED ESTIMATE Prepared by: Eric Workman Date: May 10, 2001 EAGLE COUNTY PUBLIC SERVICE FACILITY EAGLE COUNTY, COLORADO TOTAL COST: $2,445,000 COST/SF: $160 BUILDING AREAS ROOM DESCRIPTION GROSS SF MOLT. EQUIVALENT SF EXTENSION COSTISF SAGE - DIVISION 1- GENERAL REQUIREMENTS $10,750 - _ -- $40,873 $159,796 $10.44 %SF 6.5 MAIN LEVEL _- 11,357 1.00 11,35$ _ UPPER LEVEL 3,674 1.00 3,674 COVERED PORCHES 1,097 0.25 274 Div- 220 SITE EXCAVATION $0 $0 $55,379 --- ....v.�.a w-^nc rvUTAtat UI- CfUIWING: 15,128.00 TOTAL EQUIVALENT SQUARE FOOTAGE OF BUILDING: 15,305 SUMMARY OF COSTS DIVISION DESCRIPTION MATERIAL COST LABOR COST .' SUBIEC]UIP COST EXTENSION COSTISF SAGE - DIVISION 1- GENERAL REQUIREMENTS $10,750 $108,173 $40,873 $159,796 $10.44 %SF 6.5 DIVISION 2 - SITE CONSTRUCTION Div-210 FIELD ENGINEERING $0 $0 $20,000 $20,000 $1.31 LSF 0. Div- 220 SITE EXCAVATION $0 $0 $55,379 $65,379 $3.62 ISF 2.3 Div -230 SITE INFRASTRUCTURE $0 $0 $40,968 $40,968 $268 ISF 1. Div. 240 DRIVEWAY GRADING & SUBGRADE PREP. $0 $0 $112,066 511066 $7.32 ISF 4.6 Div. 250 SITE CONCRETEIPAVING $2,000 $1,300 $161,701 $165,001 $1018 ISF 6. DIV.260 LANDSCAPING /IRRIGATIONIRETAINING WALLS $2,400 $800 571,600 $74,800 $4.88 ISF 3.1 DIVISION 3 - CONCRETE Div. 310 STRUCTURAL CONCRETE $0 $0 $28,500 $28,500 $1.86 ISF 1. Div.320 FLAT CONCRETE I $0 $0 $45,205 5451205 $295 ISF 1. ! DIVISION 4 - MASONRY Div. 410 I CULTURED STONE VENEER ASSEMBLIES $0 $0 $27,072 $27,072 $1.T7 ISF 1.1 DIVISION 5 - METALS Div. 510 STRUCTURAL I MISC. STEEL I $13,525 $0.1 $18,750 532,275 $211 ISF 1.3 DIVISION 6 - WOOD & PLASTICS Div. 610 RGH FRAMING I $165,934 $166,0451 $14,520 $346,499 $2264 ISF 14. DIY. 6Z0 SIDINGlTRIM $15,531 530,060 $750 546 331 53.03 1SF 1. Div. 630 FINISH CARPENTRY $23,135 $15,000 $1,500 $39,635 $259 1SF 1.8 DIVISION 7 - THERMAL & MOISTURE PROTECTION Div. 710 INSULATION $OI so! S25,642 $25,6421 $1.68 %SF' 1. Div. 720 ROOFING SYSTEMS $0 $0! 669,972 $68,9721 $4.5715FI 28 Div. 730 SEALANTS/FLASHING 1 $3,000 � $1,760; $o $4,7W 50.31 1SF I o. Div. 740 I FOUNDATION DAMPROOFING $0 SOI $5,402 ;5,4021 $0.35 ISF � I 0. DIVISION 8 -DOORS & WINDOWS I i Div. 810 INTERIOR & EXTERIOR DOORS 1 $18,362 64,5001 I $1,600 $24,462 I $1.60 1SF, 1.0 0 TUB /SHOWER DOOR ENCLOSURES I 60 $OI $0 60 $0.00 LSFI 0. Div. 820 FINISH HARDWARE $20,062 $2,500 $0 $22.6921 $1.48 ISF i own Div. 830 WINDOWS/PAMO DOORS $30,381 $0 $7,184 $37,5851 $246 ISF' 1.5 DIVISION 9 - FINISHES Div. 910 GYPSUM /PLASTER /STUCCO /ACOUSTIC CEILING $0 $01 i $83,341 $83,341 $5.45 LSFI 3.4 Div, 920 TILE & MARBLE $0 $120 $22,760 $22,880 $1.49 ISFI 0. Div. 930 (FLOORING $0 $360 $40,170 $40,630 $265 LSF 1. 0 WOOD FLOORING (none) $0 $0 $0 $0 $0.00 1SF 0. Div. 940 PAINT & COATINGS $0 $0 $38,000 $38,000 $2AS ISF 1.8 DIVISION 10 - SPECIALTIES Div. 1010 MIRRORS& BATH ACCESSORIES $11,660 $1,588 $0 $13,338 $0.87 LSF 0.5 Div. 1010 SIGNAGE $0 $1,750 $71000 $8,750 $0.57 LSFI 0.4 DIVISION 11 -EQUIPMENT I Div. 1110 APPLIANCES $5,000 $500 $0 $5,500 $0.361SF 0.2 DFYISION 12 -FURNISHINGS Div. 1210 CABINETRYITOPS $0 $0 $41,000 $41,000 $2.681SF 1. DIVISION 13 - SPECIAL'CONSTRUCTION Div. 1310 MOVEABLE PARTITIONS $0 S0 $14,576 $14,576 $0.95 1SF 0.6 DIVISION 14 - CONVEYING SYSTEMS DIV. 1410 ELEVATOR $0 $0 $39,760 $39,760 $2.60 %SF 1.8 DIVISION 15 - MECHANICAL Div. 1510 MECHANICAL $0 $0 $92,802 $92,802 $6.06 %SF 3. Div. 1520 PLUMBING , s $0 $60,280 $60,280 $334 %SF 2. Div. 1530 FIRE SPRINKLER/EXTINGUISHERS $475 $60 $69,275 $69,810 $3.91 1SF 2.4 DIVISION 16 - ELECTRICAL Div. 1610 1 ELECTRICAL ROUG144NIFDMRES $0 $0 6173,500 $173,500 $11.34 ISF 7.1 SUBTOTAL $322,245 $334,695 51,421,158 $2,077,998 $135.77 %SF 65.0 30.00% LABOR TAX $100.379 $100,379 $6.56 LSF 4.1 0.0% MATERIALS TAX (tax exempt Project) $0 50 $0.00 %SF 0. TOTAL FIELD COSTS $322,215 $434,974 $1.421,1156 $?,176,377 $142.33 ISF 89.1 3.00% CONTTNGENCY $73,346 $419 ISF 3.0 0.71% PRIMARY GENERAL & AUTO UA6ILITY $17,369 $1.13 ISF 0. 0.15% POLLUTION LIABILITY INSURANCE $3,667 $0.24 t8F 0 0.71% PAYMENT & PERFORMANCE BONDING $17,369 $1.13 LSF 0. 0.33% BUILDERS RISK INSURANCE $8,068 $0.53 LSF 0.3 6.00% CM/GC FEE $146,692 $9.68 ISF 6.0° TOTAL COST $2,444,887 $159.74 %SF 100. ;0.uu Eagle County Public Service Facility EAGLE COUNTY, COLORADO DIVISION 1- GENERAL REQUIREMENTS CONSTRUCTION TIME: 11 MON. 47.63 WEEKS ITEM DESCRIPTION UNIT LBL j UP.M. MATERIAL U.P.L. LABOR I U.P.S. SUBIEQUP EXTENSION COST COST COST ' PROJECT MANAGEMENT � i I PROJECT SUPERINTENDENTS 1,715 HRS $0.00 $0.00 $35.00 $60,013.801 I $0.00 $0.00 $60,013.80 PROJECT MANAGEMENT 762 HRS $0.00 $0.00 $45.00 $34,293.60 $0.00 $0.00j $34,293.60 JOB SITE ITEMS 1 I. PICKUPTRUCK 11.00 MO $0.00 $0.00 $0.00 $0.00 $75.00 $825.001 $825.00 FUEL AND OIL 11.00 Mo $100.00 $1,100.00 $0.00 $0.00 $0.00 $0.001 $1,100.00 JOBSITE TRAILER 11.00 Mo $O.OD $0.00 $O.DO $0.00 $150.00 $1,650.00) $1,650.00 TELEPHONE HOOKUP 1.00 Ls $0.00 $0.00 $0.00 $0.00 $150.00 $150.00 $150.00 TELEPHONE - MONTHLY 11.00 MO $0.00 $0.00 $0.00 $0.00 $65.00 $715.00 $715.00 TELEPHONE-MOBILE n.00 MO $0.00 $0.00 80.00 $0.00 $50.00, $550.00 $550.00 POWERMONTHLYUSE 11.00 No $0.DO $0.00 $0.00 $0.00 $100.00 $1,100.00 $1,100.00 TEMPORARY FENCING s00.00 LF $4.00 $2,000.00 $2.00 $1,000.00 $0.00 $0.00 $3,000.00 TEMP TOILETS 11.00 MO $0.00 $0.00 $0.00 $0.00 $200.00 $2,200.00 $2,200.00 TEMP. HEAT 4.00 Mo $1.0w.00 $4,000.00 $250.00 $1,000.00 $0.DO $0.00 $5,000.00 PERM. HEAT 2.00 MO $0.00 $0.00 $0.00 $0.00 $500.00 $1,000.00 $1,000.00 SNOW REMOVAL - ALLOWANCE 1.00 LS $0.00 40,00 $1.500.00 $1,600.00 $'1,500.00 $1,506.00 $3,000.00 CONCRETE HEAT& PROTECTION - 1.00 LS $2,000.00 $2.000.00 50.00 $0.00 $2,000.00 $2,000.00 $4,000.00 40 YD. CONSTRUCTK)N TRASH ROLLOFF 25.00 LOS. ' 30.00 $0.00 - - $0.00 $0.00 $800.00 $20,006.00 $20,000.00 SMALL TOOLS 11.00 MO $150.06 $1,650.00 $0.00 $0.00 $0.00 $0.001 $1,650.00 WEEKLY CONSTCLEANUP 640.00 HR $0.00 $0.00 $15.OD $9,600.00 $0.00 $0.00 $9,600.00 GLASSCLEANING 15,305.25 SF $0.00 $0.00 $0.00 $0.00 $0.25 $3,826.31 $3,826.31 FINAL CLEANING 15,30525 SF $OAO $0.00 $0.05 $765.26 $0.35 $5,366.84 $40,873.15 $6,122.10 $159 786.81 TOTAL GENERAL EXPENSE v $10,750.00 $108,172.66 ;0.uu C'11 DIVISION 2 - SITE CONSTRUCTION Div. 210 ITEM FIELD ENGINEERING UNIT U.P.M. MATERIAL U.P.L Sl LAYOUT COST SUBAMUIP EXTJl 1.00 LS $O.00 COST COST FOOTER STAKE OUT $0.00 $0.00 So.- PIN FOOTER FOR WALLS 0� LS $0.0o $0.00 $0.00 $16.500.00 1 $16.500.00 (I LS $O.00 $0.00 $0.00 $0 *0" $2,000.00 $2,000-00 1 $2,0W.00 $0.00 $1.51)0.00 sl'smoo $1,50O.Do .00 0 $20 TOTAL $M.Ooo-'f Div. 220 $0.00 $0.00 .00 $20,000.00 I'll, ('o ITEM SITE EXCAVATION !::! ! i !I I I I I I DESCRPT" UNIT - LL Meldor MOBILIZE EQUIPMENT U.P.M. MATSWL UP.L. LABOR U P.& sual EXTENSION Medkdbor Bid $0.00 COST '�j CLEAR & GRUB SITE. STOCKPILE TOPSOIL ON SITE $0.00 - COST .00 $0.00 6. $2,1670.00 $2.160.0o $23 q )00 5 '�-oo Bid $0.00 so.00 $0.00 9 Mfe"Jor FOUNDATION EXCAVATION 13ACKFILL 1.00 Bid $0.00 $23,597,00 Mellor ROUGH GRADE SITE $m's".00 $23.597.00 $0.00 $0.00 511.218.00 $11 $11,218.00 $11.21&W IS j TOTAL 1.00 Bid 1 $0.00 $0.00 $0.00 $0.00 $18,404.010 IS _�j 1--� -'_ $18.404.0ND $18,404.00 Div. 230 Kill: T69,37 M.- ITEM s I $0.00 n DESCRIPTION UNIT U.P.M. MATERIAL U.P.L. L48M U.P.S. SUBEQUIP OMMSION Mellor UTILITY INSTALLATION COST COST COST Meldor Ir WATER KWN, GATE VALVES. & HYDRANT 1.00 Bid 4"WATER SERVICE &GATE VALVES 1.00 Bid 518,283.00 $18,283.00 $18.293.00 Mekbr SHALLOWTRENCH 8430 LF. 4CONDUrr $7,923.00 Mellor SANITARY SERVICE & MANHOLE 1.0D m $7,923.00 $7,923.00 ekbr TRENCHELECT FROMPOLETOOLDG. &,-ETVAULTS 1.00 Bid $4,287.00 $4.287.00 $4.287.00 1.00 Bid $7.571.00 $7.571.00 $7.571.00 $2.904.00 $2,904,00 Div. 240 $40,91111.00 00 ITEM IVE'llilili'llililili 1150 :t1l DESCRIIPTIDN UNIT M. ING i1BG PRE OD MATERIAL upj- SUMQUIP EXTel PARKING AREA ROADS, AND CURB & GUTTER COST COST COST Mekbr PREPARATION 1.00 Bid $6.00 s0.00 $0.00 $0.00 $57,700.00 U7.700.00 $57,700.00 Mekbr. EXTERIOR SLAB- SIDEWALK & BIKE PATH PREPARATION 1.00 li $0.00 M=Mellor INTERIOR SLAB PREPARATION 1.00 $0.00 $0m $0.00 $0.00 $25,542.DD eIdor ADDITIONAL WORK PER 4r27 CHANGE ORDER Bid $25.54ZOO $25,54200 1 $0.00 $0.00 $0.00 $8.56240 $81stizoo TOTAL-- 1-DO Bid $0.00 $0.00 $0.00 58.55200 -00 $20,262.00 $20.26200 $ 2.00 $ Div -250 51111068.00 $11 nn 1.00 LS Woo $0.00 $0.00 $0.00 $92,655.00 1.00 Ls $0.0o $0.00 $0.00 $0.00 s9zewwo $92,655.00 ROAD SIGNAGE $0.00 MOD $66,491.00 1.00 Bid $0.00 $0.00 $0(30 SM.491.00 $D.00 $66.491.00 1) on I.DO Bid $1,000.0() $1,01)0.0(, $0.00 $2,055.00 All 1;rE (In $ZO65.00 $Z056.00 000 $3DO.00 $m-00 $0.00 0.00 CT $100.01) $1()00() $0.00 TOTAL SI'Dwoo $100.00 $1.3w.00 ... $1.000.00 $50.00 $2,000.00 $1.300.00 $5w ou $2 600.00 51651,701.00 LANDSEi'l I IWAILS DE4CRIPTION UNIT U.P.M. MkTER AL UJP.L LABOR LANDSCAPING.SPRINKLER. & SOD COST COST COST - �PE - 1.00 LS $0.00 $0.00 S CREEN BS- TOPSOIL 80.00 Ton S30.)o $ 240.0 ( S$iDn . OD $.0 $70,000.00 70,0.0FTAL $ $70.000.00 ITEM DESCRIPTION UNIT U.P.M. T MATERIAL DIVISION 3 - CONCRETt" Div. 310 RTMIPT1192AI nf%Kiflo c ITEM DESCRIPTION UNIT U.P.M. T MATERIAL U.P.L. LABOR U.P.S. SUslEcWIP EXTENSION COAT COST , Co ST Custom I FOOTINGS, WALLS & PADS i 1.00 LS $0.00 $0.00 $0.00 $0.00 1$28.5W.00 $28,600.00 $28,500.00 1 TOTAL $0.00 $0.00 $28,600.00 $28 600.00 L v..)Aw 7 -ITFM t-LA I T.—m .00 Custom I SLAB ON GRAM 1.00 LS' $0.00 $0.00 1 $0.00 $0.00 1 $39,129.00 $39,129.00 $39,129.00 CONC. UP FLR. TOPPING & STAIR PANS -L 1.00 $o-oo so-oo $8,078.00— 56,076.00 56,076.00 DIVISION 4 - MASONRY Div. 410 Y WOrks CULTURED STONE VENEER I i 1.00 1- $27,072.00 $27,072.00/ $27,072.00 DIVISION 5 - METALS Div. 510 STRUCTURAL / MISC. STEEL ITEM DESCRIPTION UNIT U.P.M. MATERIAL j U.P.L. LABOR U.P.S. SUBIEQUIP EXTENSION COST COST c COST TVcgf jSTRUCTURALSTEEL 1.00 LS $13,525.00 $13,525.00 $0,00 $0.00 $0.00 $0.00 $13,525.00 Twolf STAIRS & RAILINGS 1.00 LS $0.00 $0.00 I 1 $0.00 $0.00 $9,000.00 $9,000.00 $9,000.00 Alpine CORRUGATED METAL SIDING ind. fasteners) 1.625,00 SF $0.00 $O.OQ I $0.00 $0.00 $6.00 9,750.00 $9,750_00 TOTAL $13,525.00 $0.00 $18,750.00 S32,275.00 5U.UU DIVISION 6 -WOOD & PLAS�iC�S OIv.610 ROUGH CARPENTRY FRAMING ITEM DESCRIPTION I UNIT I U.P.M. MATERIAL COST U.P.L. LABOR COST U.P.S. SUBIEQUIP I EXTQIS" COST 1 FRAMING HANGERS & BRACKETS 15,345.25 SF $0.10 $1,530.53 $0.00 $1.00 $0.00 $0.00 ! $1,530.5$ NAILS 8 FASTENERS 15,30525 SF I $0.35 $5,356.84 $0.00 $0.00 $0.00 $0.00 $5,356.$4 !FRAMiNGLABOR 1.00 Ls I $0.00 $0.00 $160,000.00 $160,000.00 $0.00 $0.00 I $160,000_00 FLlarton FRAMING MATERIALS 1.00 Bid $146,935.00 $146,935.00 $0.00 $0.00 w.00 $0.00 s 146,93$_60 MAT. FOR TIMBER COLUMNS, SUB - FASCIA, & I 1.00 LS 1$10,000.00 $1.250.00 $1,250.00 $750.00 $750.00 $2,000.00 MISC. FRAMING AND BLOCKING 1.00 Ls $10,000.00 $0.00 $0.00 $0.00 $0.00 I $10,000.00 JAM 6XI2' INTERIOR BEAMS 378.00 BF 1 $4.01) $1,512.00 $2.50 $945.00 $0.00 $0.00 $2,457.00 aAow FRAME DUMPSTER ENCLOSURE 1.00 LS i $600.00 $600.00 $600.00 $600.00 $0.00 $0.00 $1,200.00 FORK LIFT 6.00 MO. $17,000.00 TOTAL $15,00-00 - . 1 500.00 634.60 $600.00 $3,61M.00 $3,600.00 MOVE FORK LIFT IN & OUT 200 TRP. $75.00 $150.00 t� ! $150.00 �CRANE 180.00 HRS. $25.00 $4,500.00 $59.00 $10,620.00 I $16,120.00 M --- RANEIN &OUT . -_ 2.00 TRP. $75.00 $150.00 $150.00 �- - $166,934.35 166 048.00 $K520.00 $346A", 620 EXTERIOR SIDING Ili TRIM $0.00 REIN DESCRIPTION UNIT U.P.M. MATERIAL C09T U.P.L. LABOR COST U.P.S. SUBIE4UP COST EXTENSION FASCIAS, SOFFIT5,TREWS, DECORATIVE 1.00 Ls $12,000.00 $12,000.00 $12,000.00 BRACKETS, &VMNDOWTRIM 1.00 Ls $15,000.00 $14,000.00 $28,800.00 $28,800.00 $0.00 $0.00 $42,800.00 HARDWAREINAILS 15.30525 SF $0.10 $1,530.53 $1,530.53 SCAFFOLDING 1.00 LS $0.00 $0.00 $1.250.00 $1,250.00 $750.00 $750.00 $2,000.00 $15,530.53 $30,050.00 $760.00 330.53 Div. Sao FINISH CARPENTRY $0.00 ITEM DESCRIPTM UNIT U.P.M. MATERIAL COST U.P.L LABOR COST U.P.S. SUBIEmp COST EXTENSION FINISH CARPENTRY LABOR 1.00 Ls $12,000.00 $12,000.00 $12,000.00 FINISH CARPENTRY MATERIALS (rct base. handrails, 6bddwv) 1.00 LS $9,000.00 $9,000.00 $9,000.00 MATERIAL WASTE FACTOR 140096 $900.00 $900.00 HARDWAREMAILS 3,674.00 SF $0.20 $734 -80 $734.80 ADD ACOUSTIC WOOD CLG. IN MUTIPURPOSE/ COUI TROOM -' - - 1.00 Ls $12,500.00 $12, 500.00 $3,000.00 $3,000.00 $1,500.00 $1,500.00 $17,000.00 TOTAL $15,00-00 - . 1 500.00 634.60 $0.00 DIVISbN 7 - THERMAL 8 MOISTUROTECTION Div. 740 IN5ULA -HUN EM DESCRIPTION UNIT U.P.M. MATERIAL I U.P.L. LABOR U.P.S. SUEfEQUIP EXTENSIDN Ace Insulation j INSULATE & SOUNPROOF BUILDING I 1.00 Bid i $0.00 $0.00 $O.DO TOTAL - - -° - - -- -- .. —J� -- 1- $0.00 Div. 720 ROOFING SYSTEMS $0.00 i $25.842.00 $25,642.00 : $25,642.00 $0.00 525,642.00 525 642.00 n n ITEM ( DESCRIPTION UNIT U.P.M. MATERIAL COST U.P.L. LABOR U.P.S. SUBEOUP I EXTENSION COST COST Basalt COMPLETE ROOF SYSTEM (sNngla 8 comWtedmetal) 1.00 Bid $63,700.00 $63,700.00 j $63,700.00 Basalt GUTTERS & DOWNSPOUTS 1.00 Bid MISC. ( $4,046.00 $4,046.00 ' $4,046.00 Basalt HEATTAPE 1.00 Bid _ —__ $ 000.00 $1,750.00 750.00 -- - - - $2,226.00 $2,226.00 $2,226.00 $5,402.00 _ -__ --- TOTAL — .._._ $69,972.0 69 972.00 yu.uu Div_ 720 SEALANTS /FLASHING ITEM DESCRIPTION UNIT U.P.M. MATERIAL U.P.L. LABOR U.P.S. SUB/EQUIP 1 EXTENSION EXTENSION COST COST COST COST MISC. 1.0o LS $3,000.00 $3,000.00 $1,750.00 $1,750.00 _$_0.00 50.00 $4,750.00 _ —__ $ 000.00 $1,750.00 750.00 su.uu Div- 740 FOUNDATION DAMPROOFING ITEM DESCRIPTION UNIT U.P.M. MATF_R14L U.P.L. LABOR U.P.S. SUBJEQUIP EXTENSION COST COST COST AAA INSULATE & OAMPROOF FOUNDATION WALLS 2,920.00. SF 1 $0.00 $0.00 $0.00 $1.85 $5,402.00 $5,402.00 $0.00 $0.00 $6,402.00 $5,402.00 IV /AL DIVISION 8 -DOORS & WIND&WS Div. 810 INTERIOR & EXTERIOR DOORS ITEM DESCRIPTION UNIT i U.P.M. MATERIAL U.P.L. LABOR U.P.S. suwmw EXTENSION COST (=T 0.00 CT j I COST $0.00 $0.00 COST COST AUJMINL#A DOORS & WINDOWS Co. Doommys INT DOORS., STEEL DOORS, a INT. WINDOAS GLASS FOR 1.00 160.00 Ls 1$18,36ZOD $18,362.00 $4.500.00 so $0,00 $4.500.00 I $0.00 $0.00 $10 $0.00 t $1,6W.00 2,8MW $211862-00 6m 6 00 TOTAL .00 $18,362.00 .00 $4,500.00 $1 -00 $! 1 .00 882.00 $2 k=1 I GARAGE DOORS ITEM DESCRIPTION UNIT U.P.M. MATERIAL U.P.L. LABOR - U.P.S. StJBIEQtJP I EXTENSION U.P.S. suatcmip COST I ExTuNam COST COST (=T 0.00 CT j I TOTAL - $0.00 TUB/SHOWER DOOR ENCLOSURES I ITEM DsScfwT" ut" U.P.M. MATERIAL COST U.Pl- LABOR COST U.P.S. suatcmip COST I ExTuNam CO.Dowomp Inom 0.00 CT j $20,092.00 $20,09200 $2,500.00 - $7,500.00 $0.00 $0.00 50.00 TOTAL $0.00 $0.00 Div. 320 FINISH HARDWARE $0.00 ITEM DESCRIPTION uwr U.P.M MATERIAL I COST upj_ LABOR COST U.P.S. sumscAm COST I ExTuNam CO.Dowomp BEST" HARDWARE- Conv$ete 1.00 Bid $20,092.00 $20,09200 $2,500.00 - $7,500.00 $0.00 $0.00 $7,1194.00 TOTAL $20,097-00 —52,500.00 Div. sm WINDOWS /PATIO DOORS ITEM DEscfwnm UNIT U.P.M. MATERIAL COST U.P.L. LABOR COST U.P.S. flusmom COST EXTENSION LA-fty STOREFRONT DOORS 1.00 Ild Ind. $7.194.00 $7,194.00 $7,1194.00 La" AUJMINL#A DOORS & WINDOWS 1.00 Bid $26,691.00 $26,691.00 in Div. 6 $26,691.00 La" PATIO DOORS 1.00 Bid $3,700.00 $3,70D.00 in Div. 6 $3,700.00 TOTAL $30�391.00 $0.00 $7,194.00 $37 0 $0.00 DIVISION 9 - FINISHES - DIV.910 GYPSUWPLASTER/STUCCO /ACOUSTIC CEILING nrzm T DESCRIPTION SL Works EXTERIOR SIMULATED STUCCO (eWornaric faisN Bovee ICOMPLEfEDRYWALL Bowe 12X,' AC.TILE CEILING ON LOWER LEVEL --- -_- Div. 920 UNIT DESCRIPTION U.P.M MikTERUIL COST U.P -L 1.00 Sid $0.00 $0.00 $0.00 1.00 Bid $0.00 $0.00 $0.00 Tll F R MORRI F $0.00 ITEM DESCRIPTION UNIT LABOR U.P.S. SumsmP I EXTENSION COST 1.500.00 S.F. COST $0.00 $0.00 $10.00 $15,000.00 50.00 $23,075.00 $29,075.00 $23,075.00 $0.00 $48,266.00 $48,266.00 $48,266.00 $0.00_ $12,000.00 $12,000.00 ; 512,000.00 $0.00 $0.00 120.00 $22,760.00 $22.880.00 $83,341.00 $83,341.00 $0.00 ITEM DESCRIPTION UNIT U.P.M. MATERIAL COST U.P.L. LABOR U.P.S. SUBIEQUIP COST COST EXTENSION alow BATHROOMFLOORSBYVALLS 1.500.00 S.F. $0.00 $0.00 $0.00 $0.00 $10.00 $15,000.00 ' $15,000.00 COST FRP EXTERIOR BATHROOM WALLS 160.00 S.F. $0.00 $MOO $0.76 $120.00 ( $1.00 $150.00 $280.00 --- 17Yx 5-7/8' CULTURED MARBLE WINDOW BILLS --- - - - - - -- - 380.00 LF. $0.00 $0.00 $0_00- $0.00_ L_ $2040 $7,600.00 $7,800.00 $0.00 120.00 $22,760.00 $22.880.00 Div. 930 m nnpimr. $0.00 ITEM DESCRPTION UNIT U.P.M MATERIAL U.P.L. LABOR U.P.B. SUBlEQUP EXTENSION Larson PAINTING - COMPLETE (rd stain &vwMirl boom) ---` - --- 1.00 Bid COST COST COST 538,000.00 allow ENTRYMAT 120.00 SF $3.00 $360.00 $16.00 $1,820.00 $Z.2 SNOW TOTAL FLOORING (cm 8 virrA 1,27SAD SY I $30.00 $38.250.00 I ;38,25050 .00 Qaliom SYMONS PATINA STAIN & SEALER w Z�Z scmkg - -- 2,600.OD SF - - _ -� $3.75 $9,750.00 1- 59,750.00 TOTAL $360.00 170.00 $4053000 $0.00 Wnnn P1 nnRimn innnol ITEM DESCRIPTION UNIT U.P.M. MATERIAL COST U.P.L LABOR COST U.P.S. SUB/EQUP COST EXTENSION Larson PAINTING - COMPLETE (rd stain &vwMirl boom) ---` - --- 1.00 Bid $0.00 $0.00 $0.00 $0.00 $36,000.00 $38,000.00 538,000.00 - -- .00 ----- $0.00 $M,000.00 S38,DW.00 TOTAL TOTAL $0.00 $0.00 n:, oan AAIMT!t I:ne- nmt- -C ITEM DESCRIPTION UNIT U.P.M. MATERJIAL COST U.P.L LABOR COST U.P.S. SUBIEGUP COST EXTENSION Larson PAINTING - COMPLETE (rd stain &vwMirl boom) ---` - --- 1.00 Bid $0.00 $0.00 $0.00 $0.00 $36,000.00 $38,000.00 538,000.00 - -- .00 ----- $0.00 $M,000.00 S38,DW.00 TOTAL $0.00 G' DIVISION 10 - SPECIALTI'j Div. 1010 MIRRORS & BATH ACCESSORIES ITEM DESCRPTION UNIT U.P.M. MATERIAL . COST U.P.L. LABOR COST i UF.S SUBIEQUP COST EXTENSION allow (MIRRORS 200 SF $7.00 $1,400.00 i $0.00 $0.00 i $0.00 $0.00 $1/100.00 allow BATH ACCESSORIES 50.00 PCs $65.00 $4,250.00 $13.75 5687.50 50.00 $0.00 $4,937.50 METPAR' FLOOR MOUNT TOILET PARTITIONS 8 $0.00 $1,750.00 $7,000-00 1 $8,750.00 Aspen Leaf URINAL SCREENS -- - --- -- - -...- - - - - -- 1.00 Bid $6,000.00 $6,000.00 $1,D00.00 $7,000.00 $000 $0.00 $7,000.00 $11,BSO.OD _ - -- - -I- $1,687.50 -- '- -= —. --_ $0.00 T$13.33r.60 Div. 1020 SIGNAGE W.DD ITEM DESCRPTION UNIT U.P.M. MATERIAL COST U.P_L LABOR COST U.P.S. SUBrEQUP COST EXTENSION allow INTERIOR SIGNAGE BPLAQUE 1 LS $0.00 $0.00 $1,500.00 $1,500.00 I 56,000.00 $8,000.00 $7,500.00 slow CONSTRUCTION SIGNAGE 1.00 LS $0.00 $0.00 $250.00 $250.00 i $1,000.00 $1,000.00 $1,250.00 $0.00 $1,750.00 $7,000-00 1 $8,750.00 $0.00 c; DIVISION 11 -EQUIPMENT Dm 1110 AFPLIANCE5 ITEM DESCRIPTION UNIT U.P.M. MATERIAL U.P.L. LAaOR i U.P.S. SUWSQUIP EXTENSION COST COST COST allow I CONFI-E it APPLIANCE PACKAGE ,. S6.000.00 ! wmoa $500.00 a $0.00 $5,500.00 __L�___$5,000.00 __ __ TA 000 .00 $600.00 $0.00 $6,600.00 $0.0 DIVISION 12 - FURNISH IN DIV. 1210 CABINETRYITOPS ITEM OESCRFTK)N UNFr U.P.M. MATERIAL U.PJ— LABOR U.P.S. SUBIEQUIP EXTENSION COST COST COST low !ALL CABINETRY.c—ASEWORK &TOPS 100 LS $41,0M.00 $41,000,00 i $41,000.00 TOTAL $0.00 $0.00 $41000.00 $41,000.00 MUG Di �SION 13 - SPECIAL CONST OCTION Div. 1310 MOVEABLE PARTITIONS ITEM DESCRIPTION UNIT U.P.M. MA -RIAL U.P. L LABOR U.P.S. SUBfEQUP EXTENSION COST COST COST Powers MOVEABLE PARTITION WALLS 1.00 Bidl $14,576.00 $14,576.00 $14, TOTAL $0.00 57ra- -----fl-4,-676.00 $14,576.00 $U.OU DIVISION 14 - CONVEYING SYSTEMS IDIV. 1410 ELEVATOR ITEM DESCRIPTION UNIT U.P.M. MATERIAL U.P.L. LABOR I 'UP S. SUBJECKOP EXTENSION COST COST COST Mountain ELEVATOR 1,00 Bid $0.00 $0.00 $0.00 $0.00 1$39,760.00 $39,760.00 $39.760.00 TOM $0.00 $0.00 $39,160.00 $39,760.00 DIVISION 15 - MECHANIC L DIV.1510 MECHANICAL ITEM DESCRIPTION UNIT U.P.M. MATERIAL COST U_P.L LABOR U.P.S. SUBXWIP , EXTENSION COST COST i COST COST EXTENSION H.F.I. TOTAL PLUMBING INCL ROUGH -IN FOR FUTURE FORCED AIR HEATING & COOLING SYSTEM, INCL I $59,275.00 $59,275.00 ALL FLUES, EXHAUST & FRESH AIR VENTS end ! COMMERCIAL KITCHEN too Ls FANS, ELECTRIC HEATERS. & TRANE "TRACKER' $12.00 $60.00 $60,280.00 ;60,280.00 Backs DOC SYSTEM 1.00 Bid � $92,802.00 ;92,802.00 $92,802.00 I i _ i i I I _ $92,802.00 $92,802.00 0 Div. 1520 PLUMBING ;U.uu ITEM DESCRIPTION UNIT I U-P.M. COST COST COST EXTENSION H.F.I. TOTAL PLUMBING INCL ROUGH -IN FOR FUTURE 1.00 Bid I $59,275.00 $59,275.00 $69,275.00 Crystal COMMERCIAL KITCHEN too Ls $95.00 $475.00 $12.00 $60.00 $60,280.00 ;60,280.00 560,280.00 TOTAL — $475.00 $60.00 $59,275.00 $59,810.00 rA (Ir alternate fxtive package) 0 Div. 1530 FIRE SPRINKLERIEXTINGUISHERS iu.uu ITEM DESCRIPTION UNIT U.P.M. MATERIAL COST U.P.L. LABOR COST U.P.S. SUBIEQUIP COST EXTENSION H.F.I. FIRE SPRINKLER SYSTEM 1.00 Bid $59,275.00 $59,275.00 $69,275.00 FIRE EXTINGUISHERS 5.00 Ct $95.00 $475.00 $12.00 $60.00 $0.00 $0.00 $535.00 TOTAL — $475.00 $60.00 $59,275.00 $59,810.00 w -uu DIVISION 16 - EIECTRICACL Div. 1610 ELECTRICAL ROUGH- INIFI)ETURES ITEM DESCRIPTION UNIT U.P.M. MATERIAL U.P.L. LABOR U.P.S. SUB/EQUIP EXTENSION COST COST I COST Apex FIRE ALARM SYSTEM 1.00 Bid I $1500.00 $15,000.00 ' $15,000.00 Reeves ELECTRICAL WIRING 8 FDCTURES, (inc Matalux alternate fixture package) _ _ t.00 eid L _ _ $158,500.00 s158,500.00 1 $158,500.00 TOTAL $173,500.00 $173,500.00 $0 -00 ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 - rr Rudd Construction, Inc. ' EAGLE COUNTY TREE FARM FACILITY Prepared by. Eric Workman Task Name Complete Project Excavation/Foundation/Site Work Utility Locates Mobilize to Site Clear and Grub Site Survey and Stake Out Mass Excavate Fill & Compact Building Area Footing Excavation . Excavate & Install Utilities Backfill & Compact Utilities Backfill & Compact Foundation Rough Grading Spread Topsoil & Final Grade Landscaping & Irrigation Concrete Footings & Pads Foundation Wails & Piers Damproof Foundation Walls Interior Slab Preparation Place & Finish Interior Slabs Concrete Topping for Upper Floor Exterior Flatwork/Paving Grade & Sub -Grade Prep. for Site Conc. & Asphalt Paving Form, Place, and, Finish Site Concrete Asphalt Paving & Striping Masonry Exterior Stone Veneer Structural Steel Contract for Steel Prepare Shop Drawings for Steel Approve Shop Drawings for Steel Shop Fabrication of Steel Page 1 Duration Start I FINsh (Predecessors 2394 04117101 03115102 146d 04117101 11106101 2d 04/17101 04118101 2d 0411701 0418101 3SS 2d 04/19101 04/20101 4 Id 04/25501 0425101 5 3d 04/26101 040=1 6 5d 0501101 0507101 7 2d 05108101 06109101 8 10d 05/1001 05/23101 9 5d 052401 05(30101 10 5d 052801 06101101 19 5d 06104101 06108101 12 5d 10/16!0'1 10I2M 28 10d 10/23101 11105101 14 136d Os110101 11/16/01 5d • 05/1001 05116 n 9. 5d 05/'1701 052301 17 2d 0524(01 052501 18 3d 06A)401 061OW1 12 2d 06/1201 06/1301 55,61,66 2d 11/14101 1111501 71,67,63 44d 06/14/01 08/14/01 10d 0611401 06/2701 21 8d 06/2801 070901 24 5d 080601 08/1401 39 15d 09/26/01 10115101 15d 0925101 1011501 47 92d 06/01/01 10/08101 1 d 0wl01 06104101 31 SF 10d 060401 06/1801 32SF 7d 06/1801 06127/01 33SF 10d 062701 07/1101 34SF Page 1 Rudd Construction, Inc. EAGLE COUNTY TREE FARM FACILITY Prepared by. Eric Workman ID Task Name Duration Start Finish Predecessors 34 Erect Steel Columns & Beams 40d 07111/01 09/04101 38SS,40FF 35 Erect Stairs & Railings 3d 08131/01 09J04101 34FF 36 Install Metal Siding 10d 0925/01 10108/01 47 37 Carpentry Framing 69d 06114101 09/04/01 38 Ground Level Carpentry Framing 20d. 06/14101 07/11/01 21 39 Second Level Carpentry Framing 19d 07/12101 08177/01 38 40 Roof Carpentry Framing 20d 08108/01 09104101 39 41 Roofing 16d 09/26101 10116101 42 Complete Flashing & Roof System 15d 0926/01 10/16001 51 43 Windows, Doors, & Hardware 162d 07/10/01 02120102 44 Order Windows & Patio Doors 1 d 07/10101 07/11/01 47SF -8w 45 Order "Timely' Frames, Trim, & Interior Doors 1d 1128101 11129001 488F -6w 46 Order Finish Hardware td 01102/02 01/03102 49SF -6w 47 install Windows &Patio Doors 14d 09105101 0924001 40 48 Install "Timely' Frames, Trim, & Interior Doors 14d 01110102 0129102 80- 49 Install Finish Hardware 5d 0214/02 02/20+02 87 50 Exterior Sliding & Trim 15d 09/05101 09/26/01 51 Fascia, Soffits, & Exterior Trim 15d 09CW1 09/25001 40 52 Electric 227d 04/17/01 02/27/02 53 Set Temporary Electric Id 0417101 0417/01 54 Select & Order Electrical Fixtures 1 d 1122MI 1122101 58SS -12w 55 Electric Rough Under Slab 3d 0607/01 06111/Q7 20 56 Ground Level Electric Rough -in 10d 10/17/01 10x30001 42 57 Upper Level Electric Rough -in 10d 10/31101 11/13101 56 58 Electric Trim Out & Equipment Wiring 10d 02114102 02127/02 87 59 Plumbing 185d 06/07/01 02/20/02 60 Select & Order Plumbing Fixtures 1 d 1122101 1122)01 64SS -12w 61 Plumbing Rough Under Slab 3d 06107 /01 06/11101 20 62 Ground Level Plumbing Rough -in 5d 07/121071 07/18 /01 38 63 Second Level Plumbing Rough -in 5d OB/08/01 0811401 3962 64 Plumbing Trim Out 5d 02114102 022002 87 65 Heating & Ventilation 190d 06107101 02127102 66 Heating & Ventilation Rough Under Slab 1 d 0&07101 06107/01 20 Page 2 ID 67 68 69 70 71 72 73 74 75 76 77 78 79 80 811 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 Rudd Construction, Inc. EAGLE COUNTY TREE FARM FACILITY Prepared by. Eric Workman Task Name Heating & Ventilation Rough -in Heating & Ventilation Equipment Installation Heating & Ventilation Grilles & Registers Installation Fire Protection System Fire Protection System Rough4n Fire Protection System HeadsTrim -out Fire Dep't Connections Framing Inspection Insulation Insulate Building Drywall/Stucco/Acoustical Ceiling Hang Drywall Tape & Finish Drywall Texture Drywall Acoustical Ceiling Installation Exterior EFS Stucco Paint / Stain Caulk & Putty Exterior Paint / Stain Exterior Caulk & Putty Interior Paint / Stain Interior Ceramic Tile Select & Order Ceramic Tile Ceramic Tile Setting & Grouting Flooring Select & Order Carpet & Resilient Floor Carpet & Resilient Floor Installation Appliances Select & Order Appliances Appliances Installation Cabinets & Tops Order Cabinets, Built-Ins, & Tops Prepare Shop Drawings for Cabinets Page 3 ( Duration ( Start Finish Predecessors 20d 10/17/01 11/13/01 42 5d 02114x72 0220102 87 5d 02121W 0227x)2 68 88d 10/24/01 02122102 15d 1024101 11/13101 67FF 7d 02/14x72 0222/02 87 2d 11/14101 11/15101 71 1 d 11/14101 11/14101 71,67,63,57 5d 11/16/01 11/21101 5d 11/15101 11/21101 74 97d 10116101 02/27/02 15d 1122101 12(12171 76 15d 12/13101 01 /02/02 78 5d 01103102 01 109/02 79 10d 02/1402 0227/02 87 15d 10/16101 11AW1 28,36 72d 11106/01 02/13/02 5d 11x16101 11112/)1 82 10d 11113101 1126101 84 10d 01/10/02 0123!02 80 15d 0124102 02/13872 86 65d 11115/01 01/30/02 1 d 11/15)01 11/15/01 15d 01/10/02 01 X30/02 80 50d 12120101 DV27102 1 d 1220101 12!20101 93SS -8w 10d 02/14/02 0227/02 87 44d 01/03/02 03/05102 1 d 01 /03102 01103102 96SS -8w 4d 02/28102 03105!02 93 69d 10/19/01 01123102 1 d 10119/)1 102201 99SF -1 d 10d 1023101 11 x)6101 t 00S F -1 d Page 3 Rudd Construction, Inc. EAGLE COUNTY TREE FARM FACILITY Prepared by. Eric Workman ID Task Name buration Start Finish Predecessors 100 Approve Shop Drawings for Cabinets Shop Fabrication of Cabinets Cabinets, Built -Ins, & Tops Installation Elevator Equipment Elevator Equipment installation Elevator Trim Final inspections Punchlist Final Cleaning Move4n Date 14d 30d 10d 28d 8d 3d 1d 5d 3d td 11/07/01 11/28101 01/10/02 01110102 01/1Q02 021141172 03106M 03107102 03/12102 03115!02 11/27/01 101ST 1d 01109102 102SF -1d 0103102 80 02118f02 01/21102 80 02/18102 87 03/W" 96 03/13/02 105 03114102 107FS -2d 03/15102 10B 101 102 103 104 105 106 107 108 109 Page 4 May 10, 2001 (_-i C" RUDD CONSTRUCTION, INC. 0132 Park Ave., Basalt, CO 81621 EAGLE COUNTY PUBLIC SERVICE FACILITY EXHIBIT "E', CONTRACT TIME Per the requirements of paragraphs 2.1.8 and 6.3 of this Contract, it is agreed by the County and the CMIGC that the date of Completion of Work shall be 11 months from the date of Notice to Proceed. Since the date of Notice to Proceed has been established as April 16, 2001, the date for Completion of Work shall be March 15, 2002. A ,i RUDD CONSTRUCTION, INC. 0132 Park Ave., Basalt, CO 81621 May 10, 2001 EAGLE COUNTY PUBLIC SERVICE FACILITY EXHIBIT "1" SUMMARY OF ALLOWANCES The following allowances are included in the "Notice to Proceed" cost estimate; 1. Flagpole $ 1,300. 2. Landscaping, irrigation, sod, & topsoil 74,800. 3. Bathroom floor & wall file 15,000. 4. Entry mat 2,280. 5. Carpeting, vinyl flooring, & vinyl baseboard 38,250. 6. Mirrors & bathroom accessories 6,337. 7. Interior signage & plaques 7,500. 8. Construction signage 1,250. 9. Appliances 5,500. 10. Cabinetry, casework, & countertops 41,000. 11. Dumpster enclosure 1,200.