HomeMy WebLinkAboutC01-159 First Amendment to Rudd Construction ContractFIRST AMENDMENT TO CONTRACT BETWEEN EAGLE COUNTY, COLORADO
AND
RUDD CONSTRUCTION, INC. FOR,CONSTRUCTION OF A PUBLIC
SERVICE FACILITY AT THE TREE FARM
THIS AMENDMENT TO CONTRACT, is made and entered into th s> &day of
2001, by and between the County of Eagle, State of Colorado, through its Board
of County Commissioners ( "Eagle County'), and Rudd Construction, Inc. ( "Construction
Manager/ General Contractor" or "CM/GC ").
RECITALS
WHEREAS, Eagle County and Construction Manager/ General Contractor entered into a
contract for construction of a public facility at the Tree Farm dated December 18, 2000; and
WHEREAS, Eagle County and the CM/GC wish to enlarge the scope of work and adjust
the payment under such contract by the amount of $45,000.00; and
WHEREAS, the CM/GC has accepted the enlargement of the scope of work under the
December 18, 2000 Contract pursuant to the letter attached as Exhibit A; and
WHEREAS, Eagle County wishes to accept the contract change from a Guaranteed
Maximum Price of $2,400,000.00 to $2,445,000.00 in return for the additional work specified in
Exhibit A.
NOW, THEREFORE, in consideration of the mutual covenants and promises of the
parties hereto, the County agrees to accept the offer of the CM/GC to increase the scope of work
outlined in Exhibit A in return for a new Guaranteed Maximum Price of $2,445,000.00.
COUNTY OF EAGLE, STATE OF
G.4 COLORADO, By and Through It's
ATTEST: BOARD OF COUNTY COMMISSIONERS
119 .4 17 17
.4 - 2z-
(L,'ferk to the Roardo'f Tom C. �tone
County Commissioners Chairman
GARAB \Contracts\Rudd Tree Farm 1st amend.wpd Our file 2001 G 009
Page 1 of 1
C!
RUDD CONSTRUCTION INC
0132 Park Avenue • Basalt, Colorado 81621
May 14, 2001
Kurt Dierking, Project Manager
Eagle County Facililities Management
P.O. Box 850, 590 Broadway
Eagle. CO 81631 -7720
Dear Kurt:
Attached please find the following submissions requested in your letter of May 9/01:
- GMP /Estimate
- Project Construction Schedule (Ex. B)
Contract Time (Ex. E)
Allowances (Ex. I)
Item #3, "CM /GC Fee Structure and Cost Allocations ", and item '#5, "General Conditions/
General Requirements ", are not applicable at this stage.
The estimate is $45,000. above our target GMP of $2,400,000. This is a result of the
addition of the following items to the Project Scope of Work:
1. Additional work to complete tie -in to Valley Road $24,000.
2. Additional work to prepare Kitchen for future full
service use $ 8,000
3. Other changes, including going to a 2 -stage furnace
system. adding fire and smoke dampers in the
'Courtroom/Multi- Purpose Room, relocating the
water line, addition of wall tile in the Bathrooms,
and adding a flagpole $13,000.
Please contact me if you have any further questions.
-Yours truly
Eric M. Workman, Project Manager
C.C. Scott Smith, Reno Smith, Architects
Telephone 970/927 -9119
FAX 970/927 -4027
_ RUDD CONSTRUCTION, INC.
0132 PARK AVE.
BASALT, CO 81621
Tel: (970) 927 -9119 Fax: (970) 927 -4027
NOTICE TO PROCEED ESTIMATE
Prepared by: Eric Workman Date: May 10, 2001
EAGLE COUNTY PUBLIC SERVICE FACILITY
EAGLE COUNTY, COLORADO
TOTAL COST: $2,445,000 COST/SF: $160
BUILDING AREAS
ROOM DESCRIPTION
GROSS
SF
MOLT.
EQUIVALENT
SF
EXTENSION
COSTISF SAGE
- DIVISION 1- GENERAL REQUIREMENTS
$10,750
- _ --
$40,873
$159,796
$10.44 %SF 6.5
MAIN LEVEL _-
11,357
1.00
11,35$
_ UPPER LEVEL
3,674
1.00
3,674
COVERED PORCHES
1,097
0.25
274
Div- 220 SITE EXCAVATION
$0
$0
$55,379
--- ....v.�.a w-^nc rvUTAtat UI- CfUIWING: 15,128.00
TOTAL EQUIVALENT SQUARE FOOTAGE OF BUILDING: 15,305
SUMMARY OF COSTS
DIVISION DESCRIPTION
MATERIAL
COST
LABOR
COST .'
SUBIEC]UIP
COST
EXTENSION
COSTISF SAGE
- DIVISION 1- GENERAL REQUIREMENTS
$10,750
$108,173
$40,873
$159,796
$10.44 %SF 6.5
DIVISION 2 - SITE CONSTRUCTION
Div-210 FIELD ENGINEERING
$0
$0
$20,000
$20,000
$1.31 LSF 0.
Div- 220 SITE EXCAVATION
$0
$0
$55,379
$65,379
$3.62 ISF 2.3
Div -230 SITE INFRASTRUCTURE
$0
$0
$40,968
$40,968
$268 ISF 1.
Div. 240 DRIVEWAY GRADING & SUBGRADE PREP.
$0
$0
$112,066
511066
$7.32 ISF 4.6
Div. 250 SITE CONCRETEIPAVING
$2,000
$1,300
$161,701
$165,001
$1018 ISF 6.
DIV.260 LANDSCAPING /IRRIGATIONIRETAINING WALLS
$2,400
$800
571,600
$74,800
$4.88 ISF 3.1
DIVISION 3 - CONCRETE
Div. 310 STRUCTURAL CONCRETE
$0
$0
$28,500
$28,500
$1.86 ISF 1.
Div.320 FLAT CONCRETE I
$0
$0
$45,205
5451205
$295 ISF 1.
! DIVISION 4 - MASONRY
Div. 410 I CULTURED STONE VENEER ASSEMBLIES
$0
$0
$27,072
$27,072
$1.T7 ISF 1.1
DIVISION 5 - METALS
Div. 510 STRUCTURAL I MISC. STEEL I
$13,525
$0.1
$18,750
532,275
$211 ISF 1.3
DIVISION 6 - WOOD & PLASTICS
Div. 610 RGH FRAMING I
$165,934
$166,0451
$14,520
$346,499
$2264 ISF 14.
DIY. 6Z0 SIDINGlTRIM
$15,531
530,060
$750
546 331
53.03 1SF 1.
Div. 630 FINISH CARPENTRY
$23,135
$15,000
$1,500
$39,635
$259 1SF 1.8
DIVISION 7 - THERMAL & MOISTURE PROTECTION
Div. 710
INSULATION
$OI
so!
S25,642
$25,6421
$1.68 %SF'
1.
Div. 720
ROOFING SYSTEMS
$0
$0!
669,972
$68,9721
$4.5715FI
28
Div. 730
SEALANTS/FLASHING
1
$3,000
�
$1,760;
$o
$4,7W
50.31 1SF
I
o.
Div. 740
I FOUNDATION DAMPROOFING
$0
SOI
$5,402
;5,4021
$0.35 ISF
� I
0.
DIVISION 8 -DOORS & WINDOWS
I
i
Div. 810
INTERIOR & EXTERIOR DOORS
1 $18,362
64,5001
I
$1,600
$24,462
I
$1.60 1SF,
1.0
0
TUB /SHOWER DOOR ENCLOSURES
I 60
$OI
$0
60
$0.00 LSFI
0.
Div. 820
FINISH HARDWARE
$20,062
$2,500
$0
$22.6921
$1.48 ISF
i own
Div. 830
WINDOWS/PAMO DOORS
$30,381
$0
$7,184
$37,5851
$246 ISF'
1.5
DIVISION 9 - FINISHES
Div. 910
GYPSUM /PLASTER /STUCCO /ACOUSTIC CEILING
$0
$01
i
$83,341
$83,341
$5.45 LSFI
3.4
Div, 920
TILE & MARBLE
$0
$120
$22,760
$22,880
$1.49 ISFI
0.
Div. 930
(FLOORING
$0
$360
$40,170
$40,630
$265 LSF
1.
0
WOOD FLOORING (none)
$0
$0
$0
$0
$0.00 1SF
0.
Div. 940
PAINT & COATINGS
$0
$0
$38,000
$38,000
$2AS ISF
1.8
DIVISION 10 - SPECIALTIES
Div. 1010
MIRRORS& BATH ACCESSORIES
$11,660
$1,588
$0
$13,338
$0.87 LSF
0.5
Div. 1010
SIGNAGE
$0
$1,750
$71000
$8,750
$0.57 LSFI
0.4
DIVISION 11 -EQUIPMENT
I
Div. 1110
APPLIANCES
$5,000
$500
$0
$5,500
$0.361SF
0.2
DFYISION 12 -FURNISHINGS
Div. 1210
CABINETRYITOPS
$0
$0
$41,000
$41,000
$2.681SF
1.
DIVISION 13 - SPECIAL'CONSTRUCTION
Div. 1310
MOVEABLE PARTITIONS
$0
S0
$14,576
$14,576
$0.95 1SF
0.6
DIVISION 14 - CONVEYING SYSTEMS
DIV. 1410
ELEVATOR
$0
$0
$39,760
$39,760
$2.60 %SF
1.8
DIVISION 15 - MECHANICAL
Div. 1510
MECHANICAL
$0
$0
$92,802
$92,802
$6.06 %SF
3.
Div. 1520
PLUMBING ,
s
$0
$60,280
$60,280
$334 %SF
2.
Div. 1530
FIRE SPRINKLER/EXTINGUISHERS
$475
$60
$69,275
$69,810
$3.91 1SF
2.4
DIVISION 16 - ELECTRICAL
Div. 1610 1
ELECTRICAL ROUG144NIFDMRES
$0
$0
6173,500
$173,500
$11.34 ISF
7.1
SUBTOTAL $322,245 $334,695 51,421,158
$2,077,998
$135.77 %SF
65.0
30.00% LABOR TAX $100.379
$100,379
$6.56 LSF
4.1
0.0% MATERIALS TAX (tax exempt Project) $0
50
$0.00 %SF
0.
TOTAL FIELD COSTS $322,215 $434,974 $1.421,1156
$?,176,377
$142.33 ISF
89.1
3.00% CONTTNGENCY
$73,346
$419 ISF
3.0
0.71% PRIMARY GENERAL & AUTO UA6ILITY
$17,369
$1.13 ISF
0.
0.15% POLLUTION LIABILITY INSURANCE
$3,667
$0.24 t8F
0
0.71% PAYMENT & PERFORMANCE BONDING
$17,369
$1.13 LSF
0.
0.33% BUILDERS RISK INSURANCE
$8,068
$0.53 LSF
0.3
6.00% CM/GC FEE
$146,692
$9.68 ISF
6.0°
TOTAL COST
$2,444,887
$159.74 %SF
100.
;0.uu
Eagle County Public Service Facility
EAGLE COUNTY, COLORADO
DIVISION 1- GENERAL REQUIREMENTS
CONSTRUCTION TIME:
11 MON. 47.63
WEEKS
ITEM
DESCRIPTION
UNIT
LBL j UP.M.
MATERIAL
U.P.L.
LABOR
I U.P.S.
SUBIEQUP
EXTENSION
COST
COST
COST '
PROJECT MANAGEMENT
�
i
I
PROJECT SUPERINTENDENTS
1,715
HRS
$0.00
$0.00
$35.00
$60,013.801
I
$0.00
$0.00
$60,013.80
PROJECT MANAGEMENT
762
HRS
$0.00
$0.00
$45.00
$34,293.60
$0.00
$0.00j
$34,293.60
JOB SITE ITEMS
1
I.
PICKUPTRUCK
11.00
MO
$0.00
$0.00
$0.00
$0.00
$75.00
$825.001
$825.00
FUEL AND OIL
11.00
Mo
$100.00
$1,100.00
$0.00
$0.00
$0.00
$0.001
$1,100.00
JOBSITE TRAILER
11.00
Mo
$O.OD
$0.00
$O.DO
$0.00
$150.00
$1,650.00)
$1,650.00
TELEPHONE HOOKUP
1.00
Ls
$0.00
$0.00
$0.00
$0.00
$150.00
$150.00
$150.00
TELEPHONE - MONTHLY
11.00
MO
$0.00
$0.00
$0.00
$0.00
$65.00
$715.00
$715.00
TELEPHONE-MOBILE
n.00
MO
$0.00
$0.00
80.00
$0.00
$50.00,
$550.00
$550.00
POWERMONTHLYUSE
11.00
No
$0.DO
$0.00
$0.00
$0.00
$100.00
$1,100.00
$1,100.00
TEMPORARY FENCING
s00.00
LF
$4.00
$2,000.00
$2.00
$1,000.00
$0.00
$0.00
$3,000.00
TEMP TOILETS
11.00
MO
$0.00
$0.00
$0.00
$0.00
$200.00
$2,200.00
$2,200.00
TEMP. HEAT
4.00
Mo
$1.0w.00
$4,000.00
$250.00
$1,000.00
$0.DO
$0.00
$5,000.00
PERM. HEAT
2.00
MO
$0.00
$0.00
$0.00
$0.00
$500.00
$1,000.00
$1,000.00
SNOW REMOVAL - ALLOWANCE
1.00
LS
$0.00
40,00
$1.500.00
$1,600.00
$'1,500.00
$1,506.00
$3,000.00
CONCRETE HEAT& PROTECTION -
1.00
LS
$2,000.00
$2.000.00
50.00
$0.00
$2,000.00
$2,000.00
$4,000.00
40 YD. CONSTRUCTK)N TRASH ROLLOFF
25.00
LOS.
' 30.00
$0.00
- - $0.00
$0.00
$800.00
$20,006.00
$20,000.00
SMALL TOOLS
11.00
MO
$150.06
$1,650.00
$0.00
$0.00
$0.00
$0.001
$1,650.00
WEEKLY CONSTCLEANUP
640.00
HR
$0.00
$0.00
$15.OD
$9,600.00
$0.00
$0.00
$9,600.00
GLASSCLEANING
15,305.25
SF
$0.00
$0.00
$0.00
$0.00
$0.25
$3,826.31
$3,826.31
FINAL CLEANING
15,30525
SF
$OAO
$0.00
$0.05
$765.26
$0.35
$5,366.84
$40,873.15
$6,122.10
$159 786.81
TOTAL GENERAL EXPENSE
v
$10,750.00
$108,172.66
;0.uu
C'11
DIVISION 2 - SITE CONSTRUCTION
Div. 210
ITEM FIELD ENGINEERING
UNIT U.P.M. MATERIAL U.P.L
Sl LAYOUT COST SUBAMUIP EXTJl
1.00 LS $O.00 COST COST
FOOTER STAKE OUT $0.00 $0.00 So.-
PIN FOOTER FOR WALLS 0� LS $0.0o $0.00 $0.00 $16.500.00 1 $16.500.00
(I LS $O.00 $0.00 $0.00 $0 *0" $2,000.00 $2,000-00 1 $2,0W.00
$0.00 $1.51)0.00 sl'smoo $1,50O.Do
.00
0 $20
TOTAL $M.Ooo-'f
Div. 220 $0.00 $0.00 .00 $20,000.00
I'll, ('o
ITEM
SITE EXCAVATION !::! ! i !I I I I I I
DESCRPT" UNIT - LL
Meldor MOBILIZE EQUIPMENT U.P.M. MATSWL UP.L. LABOR U P.& sual EXTENSION
Medkdbor Bid $0.00 COST '�j
CLEAR & GRUB SITE. STOCKPILE TOPSOIL ON SITE $0.00 - COST
.00 $0.00 6. $2,1670.00 $2.160.0o
$23 q
)00
5 '�-oo
Bid $0.00 so.00 $0.00 9
Mfe"Jor FOUNDATION EXCAVATION 13ACKFILL 1.00 Bid $0.00 $23,597,00
Mellor ROUGH GRADE SITE $m's".00 $23.597.00
$0.00 $0.00 511.218.00 $11
$11,218.00 $11.21&W
IS j
TOTAL 1.00 Bid 1 $0.00 $0.00 $0.00 $0.00 $18,404.010 IS
_�j
1--� -'_ $18.404.0ND $18,404.00
Div. 230 Kill: T69,37 M.-
ITEM s
I
$0.00
n
DESCRIPTION UNIT U.P.M. MATERIAL U.P.L. L48M U.P.S. SUBEQUIP OMMSION
Mellor
UTILITY INSTALLATION COST COST COST
Meldor Ir WATER KWN, GATE VALVES. & HYDRANT 1.00 Bid
4"WATER SERVICE &GATE VALVES 1.00 Bid 518,283.00 $18,283.00 $18.293.00
Mekbr SHALLOWTRENCH 8430 LF. 4CONDUrr $7,923.00
Mellor
SANITARY SERVICE & MANHOLE 1.0D m $7,923.00 $7,923.00
ekbr TRENCHELECT FROMPOLETOOLDG. &,-ETVAULTS 1.00 Bid $4,287.00 $4.287.00 $4.287.00
1.00 Bid $7.571.00 $7.571.00 $7.571.00
$2.904.00 $2,904,00
Div. 240 $40,91111.00 00
ITEM IVE'llilili'llililili 1150 :t1l
DESCRIIPTIDN UNIT M. ING i1BG PRE OD
MATERIAL upj- SUMQUIP EXTel
PARKING AREA ROADS, AND CURB & GUTTER COST COST
COST Mekbr PREPARATION 1.00 Bid $6.00 s0.00 $0.00 $0.00 $57,700.00 U7.700.00 $57,700.00
Mekbr. EXTERIOR SLAB- SIDEWALK & BIKE PATH PREPARATION 1.00 li $0.00
M=Mellor INTERIOR SLAB PREPARATION 1.00 $0.00 $0m $0.00 $0.00 $25,542.DD
eIdor ADDITIONAL WORK PER 4r27 CHANGE ORDER Bid $25.54ZOO $25,54200
1 $0.00 $0.00 $0.00 $8.56240 $81stizoo
TOTAL-- 1-DO Bid $0.00 $0.00 $0.00 58.55200
-00 $20,262.00 $20.26200 $ 2.00
$
Div -250 51111068.00 $11 nn
1.00 LS Woo $0.00 $0.00 $0.00 $92,655.00
1.00 Ls $0.0o $0.00 $0.00 $0.00 s9zewwo $92,655.00 ROAD SIGNAGE $0.00 MOD $66,491.00
1.00 Bid $0.00 $0.00 $0(30 SM.491.00
$D.00 $66.491.00
1) on
I.DO Bid $1,000.0() $1,01)0.0(, $0.00 $2,055.00
All
1;rE (In $ZO65.00 $Z056.00
000 $3DO.00 $m-00 $0.00
0.00 CT $100.01) $1()00() $0.00
TOTAL SI'Dwoo $100.00 $1.3w.00
... $1.000.00 $50.00
$2,000.00 $1.300.00 $5w ou $2 600.00
51651,701.00
LANDSEi'l I
IWAILS DE4CRIPTION UNIT U.P.M. MkTER AL
UJP.L LABOR
LANDSCAPING.SPRINKLER. & SOD COST COST COST
- �PE - 1.00 LS $0.00 $0.00 S CREEN BS- TOPSOIL 80.00 Ton S30.)o $ 240.0 ( S$iDn . OD $.0 $70,000.00
70,0.0FTAL $
$70.000.00
ITEM DESCRIPTION UNIT U.P.M. T MATERIAL
DIVISION 3 - CONCRETt"
Div. 310
RTMIPT1192AI nf%Kiflo c
ITEM DESCRIPTION UNIT U.P.M. T MATERIAL
U.P.L.
LABOR U.P.S.
SUslEcWIP
EXTENSION
COAT
COST
,
Co ST
Custom I FOOTINGS, WALLS & PADS i 1.00 LS $0.00 $0.00 $0.00
$0.00 1$28.5W.00
$28,600.00
$28,500.00
1
TOTAL $0.00
$0.00
$28,600.00
$28 600.00
L v..)Aw
7 -ITFM
t-LA I
T.—m
.00
Custom I SLAB ON GRAM 1.00 LS' $0.00 $0.00 1 $0.00 $0.00 1 $39,129.00 $39,129.00 $39,129.00
CONC. UP FLR. TOPPING & STAIR PANS -L 1.00 $o-oo so-oo
$8,078.00— 56,076.00 56,076.00
DIVISION 4 - MASONRY
Div. 410
Y WOrks CULTURED STONE VENEER I i
1.00 1- $27,072.00 $27,072.00/ $27,072.00
DIVISION 5 - METALS
Div. 510 STRUCTURAL / MISC. STEEL
ITEM DESCRIPTION
UNIT
U.P.M. MATERIAL j
U.P.L.
LABOR
U.P.S.
SUBIEQUIP
EXTENSION
COST
COST
c
COST
TVcgf jSTRUCTURALSTEEL
1.00 LS
$13,525.00 $13,525.00
$0,00
$0.00
$0.00
$0.00
$13,525.00
Twolf STAIRS & RAILINGS
1.00 LS
$0.00 $0.00 I
1
$0.00
$0.00
$9,000.00
$9,000.00
$9,000.00
Alpine CORRUGATED METAL SIDING ind. fasteners)
1.625,00 SF
$0.00 $O.OQ I
$0.00
$0.00
$6.00
9,750.00
$9,750_00
TOTAL
$13,525.00
$0.00
$18,750.00
S32,275.00
5U.UU
DIVISION 6 -WOOD & PLAS�iC�S
OIv.610 ROUGH CARPENTRY FRAMING
ITEM DESCRIPTION
I UNIT
I U.P.M. MATERIAL
COST
U.P.L. LABOR
COST
U.P.S. SUBIEQUIP I EXTQIS"
COST
1 FRAMING HANGERS & BRACKETS
15,345.25 SF
$0.10 $1,530.53
$0.00 $1.00
$0.00 $0.00
! $1,530.5$
NAILS 8 FASTENERS
15,30525 SF
I $0.35 $5,356.84
$0.00 $0.00
$0.00 $0.00
$5,356.$4
!FRAMiNGLABOR
1.00 Ls
I $0.00 $0.00
$160,000.00 $160,000.00
$0.00 $0.00
I $160,000_00
FLlarton FRAMING MATERIALS
1.00 Bid
$146,935.00 $146,935.00
$0.00 $0.00
w.00 $0.00
s 146,93$_60
MAT. FOR TIMBER COLUMNS, SUB - FASCIA, &
I
1.00 LS
1$10,000.00
$1.250.00 $1,250.00
$750.00 $750.00
$2,000.00
MISC. FRAMING AND BLOCKING
1.00 Ls
$10,000.00
$0.00 $0.00
$0.00 $0.00
I $10,000.00
JAM 6XI2' INTERIOR BEAMS
378.00 BF
1 $4.01) $1,512.00
$2.50 $945.00
$0.00 $0.00
$2,457.00
aAow FRAME DUMPSTER ENCLOSURE
1.00 LS i
$600.00 $600.00
$600.00 $600.00
$0.00 $0.00
$1,200.00
FORK LIFT
6.00 MO.
$17,000.00
TOTAL $15,00-00
- . 1 500.00 634.60
$600.00 $3,61M.00
$3,600.00
MOVE FORK LIFT IN & OUT
200 TRP.
$75.00 $150.00
t�
! $150.00
�CRANE
180.00 HRS.
$25.00 $4,500.00
$59.00 $10,620.00 I
$16,120.00
M --- RANEIN &OUT . -_
2.00 TRP.
$75.00 $150.00
$150.00
�- -
$166,934.35 166 048.00 $K520.00 $346A",
620
EXTERIOR SIDING Ili TRIM
$0.00
REIN
DESCRIPTION
UNIT
U.P.M. MATERIAL
C09T
U.P.L. LABOR
COST
U.P.S. SUBIE4UP
COST
EXTENSION
FASCIAS, SOFFIT5,TREWS, DECORATIVE
1.00 Ls
$12,000.00 $12,000.00
$12,000.00
BRACKETS, &VMNDOWTRIM
1.00 Ls
$15,000.00 $14,000.00
$28,800.00 $28,800.00
$0.00 $0.00
$42,800.00
HARDWAREINAILS
15.30525 SF
$0.10 $1,530.53
$1,530.53
SCAFFOLDING
1.00 LS
$0.00 $0.00
$1.250.00 $1,250.00
$750.00 $750.00
$2,000.00
$15,530.53 $30,050.00 $760.00 330.53
Div. Sao
FINISH CARPENTRY
$0.00
ITEM
DESCRIPTM
UNIT
U.P.M. MATERIAL
COST
U.P.L LABOR
COST
U.P.S. SUBIEmp
COST
EXTENSION
FINISH CARPENTRY LABOR
1.00 Ls
$12,000.00 $12,000.00
$12,000.00
FINISH CARPENTRY MATERIALS (rct base.
handrails, 6bddwv)
1.00 LS
$9,000.00 $9,000.00
$9,000.00
MATERIAL WASTE FACTOR
140096
$900.00
$900.00
HARDWAREMAILS
3,674.00 SF
$0.20 $734 -80
$734.80
ADD ACOUSTIC WOOD CLG. IN MUTIPURPOSE/
COUI TROOM
-' - -
1.00 Ls
$12,500.00 $12, 500.00
$3,000.00 $3,000.00
$1,500.00 $1,500.00
$17,000.00
TOTAL $15,00-00
- . 1 500.00 634.60
$0.00
DIVISbN 7 - THERMAL 8 MOISTUROTECTION
Div. 740 IN5ULA -HUN
EM DESCRIPTION UNIT U.P.M. MATERIAL I U.P.L. LABOR U.P.S. SUEfEQUIP EXTENSIDN
Ace Insulation j INSULATE & SOUNPROOF BUILDING I 1.00 Bid i $0.00 $0.00 $O.DO
TOTAL - - -° - - -- -- .. —J� -- 1- $0.00
Div. 720
ROOFING SYSTEMS
$0.00 i $25.842.00 $25,642.00 : $25,642.00
$0.00 525,642.00 525 642.00
n n
ITEM
( DESCRIPTION
UNIT
U.P.M. MATERIAL
COST
U.P.L. LABOR U.P.S. SUBEOUP I EXTENSION
COST COST
Basalt
COMPLETE ROOF SYSTEM (sNngla 8
comWtedmetal)
1.00 Bid
$63,700.00 $63,700.00 j $63,700.00
Basalt
GUTTERS & DOWNSPOUTS
1.00 Bid
MISC.
( $4,046.00 $4,046.00 ' $4,046.00
Basalt
HEATTAPE
1.00 Bid
_ —__
$ 000.00 $1,750.00 750.00
-- - - - $2,226.00 $2,226.00 $2,226.00
$5,402.00
_ -__ ---
TOTAL
—
.._._
$69,972.0 69 972.00
yu.uu
Div_ 720 SEALANTS /FLASHING
ITEM
DESCRIPTION
UNIT
U.P.M. MATERIAL
U.P.L. LABOR
U.P.S. SUB/EQUIP 1 EXTENSION
EXTENSION
COST
COST
COST
COST
MISC.
1.0o LS
$3,000.00 $3,000.00
$1,750.00 $1,750.00
_$_0.00 50.00 $4,750.00
_ —__
$ 000.00 $1,750.00 750.00
su.uu
Div- 740 FOUNDATION DAMPROOFING
ITEM
DESCRIPTION
UNIT
U.P.M. MATF_R14L
U.P.L. LABOR
U.P.S. SUBJEQUIP
EXTENSION
COST
COST
COST
AAA
INSULATE & OAMPROOF FOUNDATION
WALLS
2,920.00. SF
1 $0.00
$0.00 $0.00
$1.85 $5,402.00
$5,402.00
$0.00 $0.00 $6,402.00 $5,402.00
IV /AL
DIVISION 8 -DOORS & WIND&WS
Div. 810 INTERIOR & EXTERIOR DOORS
ITEM
DESCRIPTION
UNIT
i U.P.M. MATERIAL
U.P.L.
LABOR U.P.S.
suwmw
EXTENSION
COST (=T
0.00 CT j
I
COST
$0.00 $0.00
COST
COST
AUJMINL#A DOORS & WINDOWS
Co. Doommys INT DOORS., STEEL DOORS, a INT. WINDOAS
GLASS FOR
1.00
160.00
Ls 1$18,36ZOD $18,362.00 $4.500.00
so $0,00
$4.500.00 I $0.00
$0.00 $10
$0.00 t
$1,6W.00
2,8MW
$211862-00
6m
6 00
TOTAL
.00
$18,362.00
.00
$4,500.00
$1 -00
$!
1 .00 882.00
$2
k=1 I
GARAGE DOORS
ITEM
DESCRIPTION
UNIT U.P.M. MATERIAL
U.P.L. LABOR - U.P.S. StJBIEQtJP
I EXTENSION
U.P.S. suatcmip
COST
I ExTuNam
COST
COST (=T
0.00 CT j
I
TOTAL -
$0.00
TUB/SHOWER DOOR ENCLOSURES
I ITEM
DsScfwT"
ut"
U.P.M. MATERIAL
COST
U.Pl- LABOR
COST
U.P.S. suatcmip
COST
I ExTuNam
CO.Dowomp
Inom
0.00 CT j
$20,092.00 $20,09200
$2,500.00 - $7,500.00
$0.00 $0.00
50.00
TOTAL $0.00 $0.00
Div. 320
FINISH HARDWARE
$0.00
ITEM
DESCRIPTION
uwr
U.P.M MATERIAL
I COST
upj_ LABOR
COST
U.P.S. sumscAm
COST
I ExTuNam
CO.Dowomp
BEST" HARDWARE- Conv$ete
1.00 Bid
$20,092.00 $20,09200
$2,500.00 - $7,500.00
$0.00 $0.00
$7,1194.00
TOTAL $20,097-00 —52,500.00
Div. sm
WINDOWS /PATIO DOORS
ITEM
DEscfwnm
UNIT
U.P.M. MATERIAL
COST
U.P.L. LABOR
COST
U.P.S. flusmom
COST
EXTENSION
LA-fty
STOREFRONT DOORS
1.00 Ild
Ind.
$7.194.00 $7,194.00
$7,1194.00
La"
AUJMINL#A DOORS & WINDOWS
1.00 Bid
$26,691.00 $26,691.00
in Div. 6
$26,691.00
La"
PATIO DOORS
1.00 Bid
$3,700.00 $3,70D.00
in Div. 6
$3,700.00
TOTAL $30�391.00 $0.00 $7,194.00 $37 0
$0.00
DIVISION 9 - FINISHES -
DIV.910 GYPSUWPLASTER/STUCCO /ACOUSTIC CEILING
nrzm T DESCRIPTION
SL Works EXTERIOR SIMULATED STUCCO (eWornaric faisN
Bovee ICOMPLEfEDRYWALL
Bowe 12X,' AC.TILE CEILING ON LOWER LEVEL --- -_-
Div. 920
UNIT
DESCRIPTION
U.P.M
MikTERUIL
COST
U.P -L
1.00
Sid
$0.00
$0.00
$0.00
1.00
Bid
$0.00
$0.00
$0.00
Tll F R MORRI F
$0.00
ITEM
DESCRIPTION
UNIT
LABOR
U.P.S.
SumsmP
I EXTENSION
COST
1.500.00 S.F.
COST
$0.00 $0.00 $10.00 $15,000.00
50.00
$23,075.00
$29,075.00
$23,075.00
$0.00
$48,266.00
$48,266.00
$48,266.00
$0.00_
$12,000.00
$12,000.00
; 512,000.00
$0.00
$0.00 120.00 $22,760.00 $22.880.00
$83,341.00
$83,341.00
$0.00
ITEM
DESCRIPTION
UNIT
U.P.M. MATERIAL
COST
U.P.L. LABOR U.P.S. SUBIEQUIP
COST COST
EXTENSION
alow
BATHROOMFLOORSBYVALLS
1.500.00 S.F.
$0.00 $0.00
$0.00 $0.00 $10.00 $15,000.00
' $15,000.00
COST
FRP EXTERIOR BATHROOM WALLS
160.00 S.F.
$0.00 $MOO
$0.76 $120.00 ( $1.00 $150.00
$280.00
---
17Yx 5-7/8' CULTURED MARBLE WINDOW BILLS ---
- - - - - -- -
380.00 LF.
$0.00 $0.00
$0_00- $0.00_ L_ $2040 $7,600.00
$7,800.00
$0.00 120.00 $22,760.00 $22.880.00
Div. 930
m nnpimr.
$0.00
ITEM
DESCRPTION
UNIT
U.P.M MATERIAL
U.P.L. LABOR
U.P.B. SUBlEQUP
EXTENSION
Larson
PAINTING - COMPLETE (rd stain &vwMirl boom)
---` - ---
1.00 Bid
COST
COST
COST
538,000.00
allow
ENTRYMAT
120.00 SF
$3.00 $360.00
$16.00 $1,820.00
$Z.2
SNOW
TOTAL FLOORING (cm 8 virrA
1,27SAD SY
I $30.00 $38.250.00
I ;38,25050 .00
Qaliom
SYMONS PATINA STAIN & SEALER w Z�Z scmkg
- --
2,600.OD SF
-
- _ -�
$3.75 $9,750.00
1- 59,750.00
TOTAL $360.00 170.00 $4053000
$0.00
Wnnn P1 nnRimn innnol
ITEM
DESCRIPTION
UNIT
U.P.M. MATERIAL
COST
U.P.L LABOR
COST
U.P.S. SUB/EQUP
COST
EXTENSION
Larson
PAINTING - COMPLETE (rd stain &vwMirl boom)
---` - ---
1.00 Bid
$0.00 $0.00
$0.00 $0.00
$36,000.00 $38,000.00
538,000.00
- -- .00 ----- $0.00 $M,000.00 S38,DW.00
TOTAL
TOTAL $0.00
$0.00
n:, oan AAIMT!t I:ne- nmt- -C
ITEM
DESCRIPTION
UNIT
U.P.M. MATERJIAL
COST
U.P.L LABOR
COST
U.P.S. SUBIEGUP
COST
EXTENSION
Larson
PAINTING - COMPLETE (rd stain &vwMirl boom)
---` - ---
1.00 Bid
$0.00 $0.00
$0.00 $0.00
$36,000.00 $38,000.00
538,000.00
- -- .00 ----- $0.00 $M,000.00 S38,DW.00
TOTAL
$0.00
G' DIVISION 10 - SPECIALTI'j
Div. 1010 MIRRORS & BATH ACCESSORIES
ITEM
DESCRPTION
UNIT
U.P.M. MATERIAL .
COST
U.P.L. LABOR
COST
i UF.S SUBIEQUP
COST
EXTENSION
allow
(MIRRORS
200 SF
$7.00 $1,400.00
i $0.00 $0.00
i
$0.00 $0.00
$1/100.00
allow
BATH ACCESSORIES
50.00 PCs
$65.00 $4,250.00
$13.75 5687.50
50.00 $0.00
$4,937.50
METPAR' FLOOR MOUNT TOILET PARTITIONS 8
$0.00
$1,750.00
$7,000-00
1 $8,750.00
Aspen Leaf
URINAL SCREENS
-- - --- -- - -...- - - - - --
1.00 Bid
$6,000.00 $6,000.00
$1,D00.00 $7,000.00
$000 $0.00
$7,000.00
$11,BSO.OD
_
- -- - -I-
$1,687.50
-- '- -= —. --_
$0.00 T$13.33r.60
Div. 1020
SIGNAGE
W.DD
ITEM
DESCRPTION
UNIT
U.P.M. MATERIAL
COST
U.P_L LABOR
COST
U.P.S. SUBrEQUP
COST
EXTENSION
allow
INTERIOR SIGNAGE BPLAQUE
1 LS
$0.00 $0.00
$1,500.00 $1,500.00
I 56,000.00 $8,000.00
$7,500.00
slow
CONSTRUCTION SIGNAGE
1.00 LS
$0.00 $0.00
$250.00 $250.00
i $1,000.00 $1,000.00
$1,250.00
$0.00
$1,750.00
$7,000-00
1 $8,750.00
$0.00
c;
DIVISION 11 -EQUIPMENT
Dm 1110 AFPLIANCE5
ITEM DESCRIPTION UNIT
U.P.M. MATERIAL
U.P.L.
LAaOR i
U.P.S. SUWSQUIP
EXTENSION
COST
COST
COST
allow I CONFI-E it APPLIANCE PACKAGE ,. S6.000.00 ! wmoa
$500.00
a $0.00
$5,500.00
__L�___$5,000.00
__
__
TA 000 .00
$600.00
$0.00
$6,600.00
$0.0
DIVISION 12 - FURNISH IN
DIV. 1210 CABINETRYITOPS
ITEM OESCRFTK)N UNFr U.P.M. MATERIAL U.PJ— LABOR U.P.S. SUBIEQUIP EXTENSION
COST COST COST
low !ALL CABINETRY.c—ASEWORK &TOPS 100 LS $41,0M.00 $41,000,00 i $41,000.00
TOTAL $0.00 $0.00 $41000.00 $41,000.00
MUG
Di �SION 13 - SPECIAL CONST OCTION
Div. 1310 MOVEABLE PARTITIONS
ITEM DESCRIPTION UNIT U.P.M. MA -RIAL U.P. L LABOR U.P.S. SUBfEQUP EXTENSION
COST COST COST
Powers MOVEABLE PARTITION WALLS 1.00 Bidl $14,576.00 $14,576.00 $14,
TOTAL $0.00 57ra-
-----fl-4,-676.00 $14,576.00
$U.OU
DIVISION 14 - CONVEYING SYSTEMS
IDIV. 1410 ELEVATOR
ITEM DESCRIPTION UNIT U.P.M. MATERIAL U.P.L. LABOR I 'UP S. SUBJECKOP EXTENSION
COST COST COST
Mountain ELEVATOR 1,00 Bid $0.00 $0.00 $0.00 $0.00 1$39,760.00 $39,760.00 $39.760.00
TOM $0.00 $0.00 $39,160.00 $39,760.00
DIVISION 15 - MECHANIC L
DIV.1510 MECHANICAL
ITEM
DESCRIPTION
UNIT U.P.M. MATERIAL
COST
U_P.L LABOR U.P.S. SUBXWIP , EXTENSION
COST COST i
COST
COST
EXTENSION
H.F.I.
TOTAL PLUMBING INCL ROUGH -IN FOR FUTURE
FORCED AIR HEATING & COOLING SYSTEM, INCL
I
$59,275.00 $59,275.00
ALL FLUES, EXHAUST & FRESH AIR VENTS end
!
COMMERCIAL KITCHEN
too Ls
FANS, ELECTRIC HEATERS. & TRANE "TRACKER'
$12.00 $60.00
$60,280.00 ;60,280.00
Backs
DOC SYSTEM
1.00 Bid
�
$92,802.00 ;92,802.00 $92,802.00
I i
_
i
i
I
I
_
$92,802.00 $92,802.00
0
Div. 1520
PLUMBING
;U.uu
ITEM
DESCRIPTION
UNIT
I U-P.M.
COST
COST
COST
EXTENSION
H.F.I.
TOTAL PLUMBING INCL ROUGH -IN FOR FUTURE
1.00 Bid
I
$59,275.00 $59,275.00
$69,275.00
Crystal
COMMERCIAL KITCHEN
too Ls
$95.00 $475.00
$12.00 $60.00
$60,280.00 ;60,280.00
560,280.00
TOTAL — $475.00 $60.00 $59,275.00 $59,810.00
rA
(Ir alternate fxtive package)
0
Div. 1530
FIRE SPRINKLERIEXTINGUISHERS
iu.uu
ITEM
DESCRIPTION
UNIT
U.P.M. MATERIAL
COST
U.P.L. LABOR
COST
U.P.S. SUBIEQUIP
COST
EXTENSION
H.F.I.
FIRE SPRINKLER SYSTEM
1.00 Bid
$59,275.00 $59,275.00
$69,275.00
FIRE EXTINGUISHERS
5.00 Ct
$95.00 $475.00
$12.00 $60.00
$0.00 $0.00
$535.00
TOTAL — $475.00 $60.00 $59,275.00 $59,810.00
w -uu
DIVISION 16 - EIECTRICACL
Div. 1610
ELECTRICAL ROUGH-
INIFI)ETURES
ITEM
DESCRIPTION
UNIT
U.P.M. MATERIAL
U.P.L. LABOR
U.P.S.
SUB/EQUIP
EXTENSION
COST
COST
I
COST
Apex
FIRE ALARM SYSTEM
1.00 Bid
I
$1500.00
$15,000.00
' $15,000.00
Reeves
ELECTRICAL WIRING 8 FDCTURES, (inc
Matalux alternate fixture package) _ _
t.00 eid
L _
_
$158,500.00
s158,500.00
1 $158,500.00
TOTAL
$173,500.00
$173,500.00
$0 -00
ID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
- rr
Rudd Construction, Inc. '
EAGLE COUNTY TREE FARM FACILITY
Prepared by. Eric Workman
Task Name
Complete Project
Excavation/Foundation/Site Work
Utility Locates
Mobilize to Site
Clear and Grub Site
Survey and Stake Out
Mass Excavate
Fill & Compact Building Area
Footing Excavation .
Excavate & Install Utilities
Backfill & Compact Utilities
Backfill & Compact Foundation
Rough Grading
Spread Topsoil & Final Grade
Landscaping & Irrigation
Concrete
Footings & Pads
Foundation Wails & Piers
Damproof Foundation Walls
Interior Slab Preparation
Place & Finish Interior Slabs
Concrete Topping for Upper Floor
Exterior Flatwork/Paving
Grade & Sub -Grade Prep. for Site Conc. & Asphalt Paving
Form, Place, and, Finish Site Concrete
Asphalt Paving & Striping
Masonry
Exterior Stone Veneer
Structural Steel
Contract for Steel
Prepare Shop Drawings for Steel
Approve Shop Drawings for Steel
Shop Fabrication of Steel
Page 1
Duration
Start I
FINsh
(Predecessors
2394
04117101
03115102
146d
04117101
11106101
2d
04/17101
04118101
2d
0411701
0418101 3SS
2d
04/19101
04/20101 4
Id
04/25501
0425101 5
3d
04/26101
040=1 6
5d
0501101
0507101 7
2d
05108101
06109101 8
10d
05/1001
05/23101 9
5d
052401
05(30101 10
5d
052801
06101101 19
5d
06104101
06108101 12
5d
10/16!0'1
10I2M 28
10d
10/23101
11105101 14
136d
Os110101
11/16/01
5d •
05/1001
05116 n 9.
5d
05/'1701
052301 17
2d
0524(01
052501 18
3d
06A)401
061OW1 12
2d
06/1201
06/1301 55,61,66
2d
11/14101
1111501 71,67,63
44d
06/14/01
08/14/01
10d
0611401
06/2701 21
8d
06/2801
070901 24
5d
080601
08/1401 39
15d
09/26/01
10115101
15d
0925101
1011501 47
92d
06/01/01
10/08101
1 d
0wl01
06104101 31 SF
10d
060401
06/1801 32SF
7d
06/1801
06127/01 33SF
10d
062701
07/1101 34SF
Page 1
Rudd Construction, Inc.
EAGLE COUNTY TREE FARM FACILITY
Prepared by. Eric Workman
ID
Task Name
Duration
Start
Finish
Predecessors
34
Erect Steel Columns & Beams
40d
07111/01
09/04101 38SS,40FF
35
Erect Stairs & Railings
3d
08131/01
09J04101 34FF
36
Install Metal Siding
10d
0925/01
10108/01 47
37
Carpentry Framing
69d
06114101
09/04/01
38
Ground Level Carpentry Framing
20d.
06/14101
07/11/01 21
39
Second Level Carpentry Framing
19d
07/12101
08177/01 38
40
Roof Carpentry Framing
20d
08108/01
09104101 39
41
Roofing
16d
09/26101
10116101
42
Complete Flashing & Roof System
15d
0926/01
10/16001 51
43
Windows, Doors, & Hardware
162d
07/10/01
02120102
44
Order Windows & Patio Doors
1 d
07/10101
07/11/01 47SF -8w
45
Order "Timely' Frames, Trim, & Interior Doors
1d
1128101
11129001 488F -6w
46
Order Finish Hardware
td
01102/02
01/03102 49SF -6w
47
install Windows &Patio Doors
14d
09105101
0924001 40
48
Install "Timely' Frames, Trim, & Interior Doors
14d
01110102
0129102 80-
49
Install Finish Hardware
5d
0214/02
02/20+02 87
50
Exterior Sliding & Trim
15d
09/05101
09/26/01
51
Fascia, Soffits, & Exterior Trim
15d
09CW1
09/25001 40
52
Electric
227d
04/17/01
02/27/02
53
Set Temporary Electric
Id
0417101
0417/01
54
Select & Order Electrical Fixtures
1 d
1122MI
1122101 58SS -12w
55
Electric Rough Under Slab
3d
0607/01
06111/Q7 20
56
Ground Level Electric Rough -in
10d
10/17/01
10x30001 42
57
Upper Level Electric Rough -in
10d
10/31101
11/13101 56
58
Electric Trim Out & Equipment Wiring
10d
02114102
02127/02 87
59
Plumbing
185d
06/07/01
02/20/02
60
Select & Order Plumbing Fixtures
1 d
1122101
1122)01 64SS -12w
61
Plumbing Rough Under Slab
3d
06107 /01
06/11101 20
62
Ground Level Plumbing Rough -in
5d
07/121071
07/18 /01 38
63
Second Level Plumbing Rough -in
5d
OB/08/01
0811401 3962
64
Plumbing Trim Out
5d
02114102
022002 87
65
Heating & Ventilation
190d
06107101
02127102
66
Heating & Ventilation Rough Under Slab
1 d
0&07101
06107/01 20
Page 2
ID
67
68
69
70
71
72
73
74
75
76
77
78
79
80
811
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
Rudd Construction, Inc.
EAGLE COUNTY TREE FARM FACILITY
Prepared by. Eric Workman
Task Name
Heating & Ventilation Rough -in
Heating & Ventilation Equipment Installation
Heating & Ventilation Grilles & Registers Installation
Fire Protection System
Fire Protection System Rough4n
Fire Protection System HeadsTrim -out
Fire Dep't Connections
Framing Inspection
Insulation
Insulate Building
Drywall/Stucco/Acoustical Ceiling
Hang Drywall
Tape & Finish Drywall
Texture Drywall
Acoustical Ceiling Installation
Exterior EFS Stucco
Paint / Stain
Caulk & Putty Exterior
Paint / Stain Exterior
Caulk & Putty Interior
Paint / Stain Interior
Ceramic Tile
Select & Order Ceramic Tile
Ceramic Tile Setting & Grouting
Flooring
Select & Order Carpet & Resilient Floor
Carpet & Resilient Floor Installation
Appliances
Select & Order Appliances
Appliances Installation
Cabinets & Tops
Order Cabinets, Built-Ins, & Tops
Prepare Shop Drawings for Cabinets
Page 3
( Duration (
Start
Finish
Predecessors
20d
10/17/01
11/13/01 42
5d
02114x72
0220102 87
5d
02121W
0227x)2 68
88d
10/24/01
02122102
15d
1024101
11/13101 67FF
7d
02/14x72
0222/02 87
2d
11/14101
11/15101 71
1 d
11/14101
11/14101 71,67,63,57
5d
11/16/01
11/21101
5d
11/15101
11/21101 74
97d
10116101
02/27/02
15d
1122101
12(12171 76
15d
12/13101
01 /02/02 78
5d
01103102
01 109/02 79
10d
02/1402
0227/02 87
15d
10/16101
11AW1 28,36
72d
11106/01
02/13/02
5d
11x16101
11112/)1 82
10d
11113101
1126101 84
10d
01/10/02
0123!02 80
15d
0124102
02/13872 86
65d
11115/01
01/30/02
1 d
11/15)01
11/15/01
15d
01/10/02
01 X30/02 80
50d
12120101
DV27102
1 d
1220101
12!20101 93SS -8w
10d
02/14/02
0227/02 87
44d
01/03/02
03/05102
1 d
01 /03102
01103102 96SS -8w
4d
02/28102
03105!02 93
69d
10/19/01
01123102
1 d
10119/)1
102201 99SF -1 d
10d
1023101
11 x)6101 t 00S F -1 d
Page 3
Rudd Construction, Inc.
EAGLE COUNTY TREE FARM FACILITY
Prepared by. Eric Workman
ID
Task Name
buration
Start
Finish
Predecessors
100
Approve Shop Drawings for Cabinets
Shop Fabrication of Cabinets
Cabinets, Built -Ins, & Tops Installation
Elevator Equipment
Elevator Equipment installation
Elevator Trim
Final inspections
Punchlist
Final Cleaning
Move4n Date
14d
30d
10d
28d
8d
3d
1d
5d
3d
td
11/07/01
11/28101
01/10/02
01110102
01/1Q02
021141172
03106M
03107102
03/12102
03115!02
11/27/01 101ST 1d
01109102 102SF -1d
0103102 80
02118f02
01/21102 80
02/18102 87
03/W" 96
03/13/02 105
03114102 107FS -2d
03/15102 10B
101
102
103
104
105
106
107
108
109
Page 4
May 10, 2001
(_-i C"
RUDD CONSTRUCTION, INC.
0132 Park Ave., Basalt, CO 81621
EAGLE COUNTY PUBLIC SERVICE FACILITY
EXHIBIT "E',
CONTRACT TIME
Per the requirements of paragraphs 2.1.8 and 6.3 of this Contract, it is agreed by
the County and the CMIGC that the date of Completion of Work shall be 11
months from the date of Notice to Proceed.
Since the date of Notice to Proceed has been established as April 16, 2001, the
date for Completion of Work shall be March 15, 2002.
A
,i RUDD CONSTRUCTION, INC.
0132 Park Ave., Basalt, CO 81621
May 10, 2001
EAGLE COUNTY PUBLIC SERVICE FACILITY
EXHIBIT "1"
SUMMARY OF ALLOWANCES
The following allowances are included in the "Notice to Proceed" cost estimate;
1.
Flagpole
$ 1,300.
2.
Landscaping, irrigation, sod, & topsoil
74,800.
3.
Bathroom floor & wall file
15,000.
4.
Entry mat
2,280.
5.
Carpeting, vinyl flooring, & vinyl baseboard
38,250.
6.
Mirrors & bathroom accessories
6,337.
7.
Interior signage & plaques
7,500.
8.
Construction signage
1,250.
9.
Appliances
5,500.
10.
Cabinetry, casework, & countertops
41,000.
11.
Dumpster enclosure
1,200.