HomeMy WebLinkAboutC88-131 Holy Cross - service for Airport RunwayC88- 131 -17
HOLY CROSS ( LECTRIC ASSC NATION,
3799 HIGHWAY 82 AREA CODE
P. O. DRAWER 2150 303
GLENWOOD SPRINGS, COLORADO 81602 945 -5491
December 2, 1988
Mr. Dan Reynolds "..
Eagle County Airport
P. 0. Box 850
Eagle, Colorado 81637
RE: Electric Service for West End
of County Airport Runway
Dear Mr. Reynolds:
We have completed a design and cost estimate for providing electric
service to the above mentioned project. Our facilities will be
installed as shown on the attached sketch.
Holy Cross Electric estimates that the cost of construction will be
as follows
Total estimated cost of overhead
construction $ 2150.00
Construction deposit (refundable)
required before beginning work
on the project $ 2150.00
The above figures are only estimates. After the job has been
completed, the actual cost of construction will be determined. Your
construction deposit will be adjusted to reflect the actual cost by
making a refund or further assessment. Execution of this document
constitutes agreement to pay any further assessment in a timely
manner. Adjusted construction deposits are available for refund
over a ten year period as specified by Holy Cross Electric's Line
Extension Policy.
The following conditions are hereby noted:
1. Secondary voltage available will be 120/240, single - phase.
2. Secondary facilities shall be installed in accordance with
National Electrical Code and Holy Cross Electric specifications.
All meter locations must be approved. Any service over 200 amps
or 240 volts must have prior written approval from Holy Cross
Electric.
3. It will be your responsibility to install an acceptable
secondary riser on the pole and extend underground secondary
conductors to points of power usage. Disconnect requirements
and location must be approved by Holy Cross Electric.
4. All underground services shall be installed in conduit ahead of
the meter. All underground services must be in conduit beneath
roads, driveways, and other areas of difficult excavation.
5. It shall be the consumer's responsibility to protect their
electric equipment from temporary over voltage or under voltage
situations resulting from causes beyond the control of Holy
Cross Electric.
6. The above mentioned cost estimate does not include connect fees
or meter deposits, if required. Arrangements for payment of
these items and for scheduling the actual meter installation
should be made through the local Holy Cross Electric office.
Y
Mr. Dan Reynolds
Eagle County Airport
December 2, 1988
Page Two
-------------- - - - - --
7. We attempt to complete all projects in a timely manner.
However, highest priority is given to maintaining service to
our existing consumers. This fact, along with inevitable
construction delays, will not allow us to guarantee a project
completion date.
When Holy Cross Electric is in receipt of your check in the amount
of $2,150.00, all necessary executed easements, other permits, if
required, and the signed original of this letter agreement (below),
the job can be scheduled for construction.
Sincerely,
HOLY CROSS ELECTRIC ASSOCIATION, INC.
" fil
j ;t=
Michael L verty,
Engineering Technic,'an
Enclosure
ML:rjm
The above terms and conditions
are hereby agreed to and accepted
BY:-®
TITLE: Chairman, Board of County Commissioners
DATE: -L eu-mber obi {988
W/O #88- 12027 :39- 04:Eagle County Airport, West Runway Service
z