HomeMy WebLinkAboutC88-131 Holy Cross - service for Airport RunwayC88- 131 -17 HOLY CROSS ( LECTRIC ASSC NATION, 3799 HIGHWAY 82 AREA CODE P. O. DRAWER 2150 303 GLENWOOD SPRINGS, COLORADO 81602 945 -5491 December 2, 1988 Mr. Dan Reynolds ".. Eagle County Airport P. 0. Box 850 Eagle, Colorado 81637 RE: Electric Service for West End of County Airport Runway Dear Mr. Reynolds: We have completed a design and cost estimate for providing electric service to the above mentioned project. Our facilities will be installed as shown on the attached sketch. Holy Cross Electric estimates that the cost of construction will be as follows Total estimated cost of overhead construction $ 2150.00 Construction deposit (refundable) required before beginning work on the project $ 2150.00 The above figures are only estimates. After the job has been completed, the actual cost of construction will be determined. Your construction deposit will be adjusted to reflect the actual cost by making a refund or further assessment. Execution of this document constitutes agreement to pay any further assessment in a timely manner. Adjusted construction deposits are available for refund over a ten year period as specified by Holy Cross Electric's Line Extension Policy. The following conditions are hereby noted: 1. Secondary voltage available will be 120/240, single - phase. 2. Secondary facilities shall be installed in accordance with National Electrical Code and Holy Cross Electric specifications. All meter locations must be approved. Any service over 200 amps or 240 volts must have prior written approval from Holy Cross Electric. 3. It will be your responsibility to install an acceptable secondary riser on the pole and extend underground secondary conductors to points of power usage. Disconnect requirements and location must be approved by Holy Cross Electric. 4. All underground services shall be installed in conduit ahead of the meter. All underground services must be in conduit beneath roads, driveways, and other areas of difficult excavation. 5. It shall be the consumer's responsibility to protect their electric equipment from temporary over voltage or under voltage situations resulting from causes beyond the control of Holy Cross Electric. 6. The above mentioned cost estimate does not include connect fees or meter deposits, if required. Arrangements for payment of these items and for scheduling the actual meter installation should be made through the local Holy Cross Electric office. Y Mr. Dan Reynolds Eagle County Airport December 2, 1988 Page Two -------------- - - - - -- 7. We attempt to complete all projects in a timely manner. However, highest priority is given to maintaining service to our existing consumers. This fact, along with inevitable construction delays, will not allow us to guarantee a project completion date. When Holy Cross Electric is in receipt of your check in the amount of $2,150.00, all necessary executed easements, other permits, if required, and the signed original of this letter agreement (below), the job can be scheduled for construction. Sincerely, HOLY CROSS ELECTRIC ASSOCIATION, INC. " fil j ;t= Michael L verty, Engineering Technic,'an Enclosure ML:rjm The above terms and conditions are hereby agreed to and accepted BY:-® TITLE: Chairman, Board of County Commissioners DATE: -L eu-mber obi {988 W/O #88- 12027 :39- 04:Eagle County Airport, West Runway Service z