HomeMy WebLinkAboutC88-119 HACO re: guardrail on Cooley Mesa Road & High StreetAGREEMENT C88-119-21
THIS AGREEMENT is dated as of the date of
in the year 19 91 by and between
Board of County Commissioners
Eagle county, Colorado
(hereinafter called OWNER)
HACO Contractors, Inc.
18610 W. Highway 72
Golden, CO 80403
(hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual
covenants set forth, agree as follows:
ARTICLE I - WORK
CONTRACTOR shall complete all Work as specified or
indicated in the Contract Documents. The work is
generally described as follows:
Gutardrail on 0c><>1 �3r Mesa 13"C>--eta & U:LJg1-1
The Project has been designed by the Eagle County Engineer
,(an employee of Eagle County) who is hereinafter called
ENGINEER and will assume all duties and responsibilities
and will have the rights and authority assigned to
ENGINEER in the Contract Documents in connection with
completion of the Work in accordance with the Contract
.Documents.
ARTICLE 3 - CONTRACT -,--,AE
3.1 The Work will be substantially completed on or
before December 1, 1988 and completed
and ready for final payment in accordance with
paragraph 14.13 of the General Conditions on or
before December 1, 1988
3.2 LIQUIDATED DAMAGES: OWNER and CONTRACTOR recognize
that time is of the essence of this Agreement and
that OWNER will suffer financial loss if the work is
not substantially complete within the time specified
in paragraph 3.1 above, plus any extensions thereof
allowed in accordance with Article 12 of the General
Conditions. They also recognize the delays, expense
and difficulties involved in proving in a legal or
arbitration proceeding the actual loss suffered by
OWNER if the Work is not substantially complete on
time. Accordingly, instead of requiring such proof,
OWNER and CONTRACTOR agree that as liquidated
damages for delay (but not as a penalty) CONTRACTOR
shall pay OWNER One Hundred Forty dollars
( $ 140.00 ) for each day that expires after the
time specified in paragraph 3.1 for substantial
completion until the Work is substantially complete.
ARTICLE 4 - CONTRACT PRICE
4.1 OWNER shall pay CONTRACTOR for performance of the
Work in accordance with the Contract Documents in
current funds as follows:
(See Attached Bid Form)
(Marked Exhibit A)
ARTICLE 5 - PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in
accordance with Article 14 of the General
Conditions. Applications for Payment will be
processed by ENGINEER as provided in the General
Conditions.
2
PROGRESS OWNER shall make C-,'nthly
progress payments on account of the Contract Price
on the basis of CONTRACTOR's Applications for
Payment as recommended by ENGINEER, as provided
below. All progress payments will be on the basis
of the progress of the Work measured by the schedule
of values provided for in paragraph 14.1 of the
General Conditions.
5.1.1 Prior to Substantial Completion progress
payments will be in an amount equal to:
90 % of the Work completed until
fifty percent of the Work is performed
after which no additional retainage shall
be withheld, and
90 % of materials and equipment
not incorporated in the Work but delivered
and suitably stored, less in each case the
aggregate of payments previously made.
5.1.2 Upon Substantial Completion, OWNER shall
pay an amount sufficient to increase total
payments to CONTRACTOR to 95 % of
the Contract Price, less such amounts as
ENGINEER shall determine in accordance with
paragraph 14.7 of the General Conditions.
5.2 FINAL PAYMENT: Upon final completion and acceptance
in accordance with paragraph 14.13 of the General
Conditions, OWNER shall pay the remainder of the
Contract Price as recommended by ENGINEER as
provided in said paragraph 14.13. The final payment
shall not be made until after final settlement of
this contract has been duly advertised at least ten
days prior to such final payment by publication of
notice thereof at least twice in a public newspaper
of general circulation published in Eagle county,
and the Board of County Commissioners has held a
public hearing, thereupon and complied with the
Revised Statues 1973, Section 38-26-107 as amended.
Final payment shall be made in accordance with the
requirements of aforesaid statue.
ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to enter into this
AGREEMENT, CONTRACTOR makes the following
representations:
3
6,.1 CONTRACT(Cnas familiarized himself �_-_'h the nature
and extent of the Contract Documents, Work,
locality, and with all local conditions and federal,
state and local laws, ordinances rules and
regulations that in any manner may affect cost,
progress or performance of the Work.
6.2 CONTRACTOR has studied carefully all reports of
investigations and tests of subsurface and latent
physical conditions at the site or otherwise
affecting cost, progress or performance of the Work
which were relied upon by ENGINEER in the
preparation of the Drawings and Specifications and
which have been identified in the Supplementary
Conditions.
6.3 CONTRACTOR has made or caused to be made
examinations, investigations and tests and studies
of such reports and related data in addition to
those referred to in paragraph 6.2 as he deems
necessary for the performance of the Work at the
Contract Price, within the Contract Time and in
accordance with other terms and conditions of the
Contract Documents; and no additional examinations,
investigations, tests, reports or similar data are
or will be required by CONTRACTOR for such purposes.
6.4 CONTRACTOR has correlated the results of all such
observations, examinations, investigations, tests,
reports and data with the terms and conditions of
the Contract Documents.
6.5 CONTRACTOR has given ENGINEER written notice of all
conflicts, errors or discrepancies that he has
discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to
CONTRACTOR.
The Contract Documents which comprise the entire
Agreement, made a part hereof and consists of the
following:
7.1 This Agreement (Pages -- 1 to 7 , inclusive).
4
7.2 Exhibits C, to 5
to this Agreement (Pages (---Z
inclusive).
7.3 Performance and other Bonds, identified as
exhibits and consisting of
pages.
7.4 Notice of Award.
7.5 General Conditions (Pages 1 to 54
inclusive).
7.6 Special Provisions bearing the title and consisting
of 4 divisions and 9 pages, as listed in
the table of contents thereof.
7.7 Drawings, consisting of 2 pages.
7.8 Addenda numbers 1 to I , inclusive.
7.9 Documentation submitted by CONTRACTOR prior to
Notice of Award (Pages to . inclusive).
7.10 Any Modification, including change orders, duly
delivered after execution of Agreement.
There are no Contract Documents other than those listed
above in this Article 7. The Contract Documents may only
be altered, amended or repealed by a Modification (as
defined in Section 1 of the General Conditions).
ARTICLE 8 - MISCELLANEOUS.
8.1 The terms used in this Agreement which are defined
in Article 1 of the General conditions shall have
the meanings indicated in the General conditions.
5
8.2 No assigr_-.,�nt by a party hereto of ac_'-- Irights under
or interests in the Contract Documents will be
binding on another party hereto without the written
consent of the party sought to be bound; and
specifically but without limitation, moneys that may
become due and moneys that are due may not be
assigned without such consent (except to the extent
that the effect of this restriction may be limited
by law), and unless specifically stated to the
contrary in any written consent to an assignment no
assignment will release or discharge the assignor
from any duty or responsibility under the Contract
Documents.
8.3 OWNER and CONTRACTOR each binds himself, his
partners, successors, assigns and legal
representatives to the other party hereto, his
partners, successors, assigns and legal
representatives in respect to all covenants,
agreements and obligations contained in the Contract
Documents.
ARTICLE 9 - OTHER PROVISIONS.
IN WITNESS WHEREOF, the parties hereto have signed
this Agreement in triplicate. one counterpart each
has been delivered to OWNER, CONTRACTOR and
ENGINEER. All portions of the Contract Documents
have been signed or identified by OWNER and
CONTRACTOR or by ENGINEER on their behalf.
I This AgreementGill be effective on N V C" K I , 19 92
OWNER: Eagle County Board of CONTRACTOR:
County Commissioners
BY:
F.INW#*Vj
(CORPORATE'S'EAL)
Eagle County Board of
County Commissioners
P.O. Box 850
Eagle, Colorado 81631
6
�, Ci
c
- 0 -I
MY,
EXHIBIT A
RTn vnpu
PROJECT IDENTIFICATION:
CONTRACT IDENTIFICATION AND NUMBER:
THIS BID IS SUBMITTED TO:
Board of County Commissioners
Eagle County
550 Broadwav
Eagle, Colorado 81631
Attn: Larry Metternick, Eagle County Engineer
1. The undersigned BIDDER proposes and agrees, if this Bid is
accepted, to enter into an Agreement with OWNER in the
form included in the Contract Documents to complete all
Work as specified or indicated in the Contract Documents
for the Contract Price and within the Contract Time
indicated in this Bid and in accordance with the Contract
Documents.
2. BIDDER accepts all of the terms and conditions of the
Instructions to Bidders, including without limitation
those dealing with the disposition of Bid Security. This
Bid will remain open for thirty days after the day of Bid
opening. Didder will sign the Agreement and submit-the
Contract Security and other documents required by tiie
Contract Documents within fifteen days after the date of
OWNER'S ?notice of Award.
3. In submitting this Bid, BIDDER represents, as more fully
set forth in the Agreement, that:
(a) BIDDER has examined copies of all the Contract
Documents and of the following addenda:
Date Number
(Receipt of all of which is hereby acknowledged) and also
copies of the Advertisement or Invitation to aid and the
Instructions to Bidders;
1
' (b) BIDDER has examined the site and locality where the
Work is to be performed, the legal requirements
(federal, state and local laws, ordinances, rules
and regulations) and the conditions affecting cost,
progress or performance of the Work and has made
such independent investigations as BIDDER deems
necessary;
(c) This Bid is genuine and not made in the interest of
or on behalf of any undisclosed person, firm or
corporation and is not submitted in conformity with
any agreement or rules of any group, association,
organization or corporation; BIDDER has not directly
or indirectly induced or solicited any other Bidder
to submit a false or sham Bid; BIDDER has not
solicited or induced any person, firm or a
corporation to refrain from bidding; and BIDDER has
not sought by collusion to obtain for himself any
advantage over any other Bidder or over OWNER.
4. BIDDER will complete the Work for the following lump sum
and unit prices:
Item
Description Qty
Unit
Unit Price
Amount
1.
Guard Rail, 1,700
L.F.
So
�_
ao
0 142 PTO._
Type 3- Galvanized
(Cooley Mesa Rd)
'
Qp
coo
2.
Guard Rail, 300
L.F.
!�_
3300
Type 3- galvan_.zed
�-
(High Street)
+�
o0
3.
End Anchorage, 6
Each
Type 3E- Galvanized
ciO
�
4.
Six Foot Timber 40
Each
25
Posts (Delivered to
T
Road & Bridge Shop
in Basalt)
co
5.
Construction Zone
L.S.
4000
wo
Traffic Maintenance,
Management & Control
TOTAL
p2 ��
C, C
5. BIDDER agrees that Work will be substantially completed on
or before December 1, 1988
and completed by December 1, 1988
BIDDER accepts the provisions of the Agreement as to
liquidated damages in the event of failure to complete the
Work on time.
6. The following documents are attached to and made a
condition of this Bid:
(a) Required Bid Security in the form of a certified or
bank check or a Bid Bond.
7. Communication concerning this Bid shall be addressed to:
The address of BIDDER indicated below:
Haco Contractors, Inc.
18610 West Highway 72
Golden, CO 80403
C
3
>: --
8. The terms used in this Bid which are defined in the
General Conditions of the Construction Contract included
as part of the Contract Documents have the meanings
assigned to them in the General Conditions.
SUBMITTED ON September 30, 1988 1 19
If BIDDER IS:
An Individual
By (SEAL)
(Individual's Name)
Doing business as
Business address:
Phone Number
A Partnership
By (SEAL)
(Firm Name)
( General Partner)
Business Address:
Phone Number:
4
A Corporation
By: Haco Contractors, Inc.
C/ (corporation Name)
State of --Tncorpora -,ion
By: 'ILIi� �, , C
(,Name of Person Authoriz
Craig A. Pascal President
(Title)
`(�o }yporate Se 1
'
At t'e.S t t/
(Secretary)
Business Address: 18610 West Highway 72
Phcne Number: (303) 423 -8030
A Joint Venture
By:
M
(Name
(Address)
Name
(Address)
o Sign)
(Each joint venturer must sign. The manner of signing for
each individual, partnership and corporation that is a
party to the joint venture should be in the manner
indicated above).