No preview available
HomeMy WebLinkAboutC87-152 change order for Hooks Bridge ReplacementN Engineering Offi EAGLE COUNTY 550 Broadway ;87-152-21 P.O. Box 850 EAGLE, COLORADO 81631 (303) 328-7311 Ext. 545 To Robillard & Associates, Inc. i.O.Bo.-c 589 Silverthorne, Co 80498 LETTE F TRANSMITTAL DATE August 26. 1f' JOB NO. ATTENTION David Gr1 f� RE: 8/13/87 C11a . ria r �.1 1 Suggested Aotinn, passed by Board on Auzust 24. 1997 WE ARE SENDING YOU ❑ Attached ❑ Enclosed ❑ Under Seperate Cover p Plans ❑ Copy of letter ® Change order ❑ Application for Payment ❑Information O r i rri n,4 7_ COPIES DATE DESCRIPTION 1 8/13/87 C11a . ria r �.1 1 Suggested Aotinn, passed by Board on Auzust 24. 1997 THESE ARE TRANSMITTED as checked below: El For approval ❑ For your use ❑ For review and comment ❑ REMARKS COPYTO File For your files, Thant -_ You ❑ As requested SIGNED: i�;�'(,LCC If enclosures are not as noted, kindly notify us at once. CHANGE ORDER (Instructions on reverse side) No 1 PROJECT: Hooks Bridge Replacement DATE OF ISSUANCE: June 16, 1987 OWNER: Eagle County Board of County Commissioners (Name, P.O. Box 850 Address) Eagle, CO" 81631 CONTRACTOR: Civil Constructors, Inc. P.O. Box 3908 Englewood, CO 80155 CONTRACT FOR: Construction of Hooks Bridge Replacement OWNER's Project No. n/a ENGINEER: Robillard & Associates, Inc. P.O. Box 589 Silverthorne, CO 80498 ENGINEER's Project No. 11151-208 You are directed to make the following changes in the Contract Documents. Description: Revise drawing sheet 10 to reorient transverse deck reinforcing bars and form flutes from parallel to the centerline of the bearings to perpendicular to the project line. Purpose of Change Order: Contractor requested change to simplify construction techniques. Attachments: (List documents supporting change) none CHANGE IN CONTRACT PRICE: Original Contract Price $ 333.337.15 CHANGE IN CONTRACT TIME: Original Contract Time October 15. 1987 days or date Previous Change Orders No. to No. $ n/a Net change from previous Change Orders n/a days Contract Price prior to this Change Order $ 333,337.15 Contract Time Prior to this Change Order October 15, 1987 days or date Net Increase (decrease) of this Change Order $ n/a Net Increase (decrease) of this Change Order n/a days Contract Price with all approved Change Orders $ 333,337.15 Contract Time with all approved Change Orders October 15, 1987 days or date a.a . vininnivlJJ 1J: APPR D: APPR¢ Engineer b r ontract r EJCDC No. 1910-8-B (1983 ition) Prepared by the Engineers' Joint Contract Documents Committee an end rs by The Associated General Contractors of America.