HomeMy WebLinkAboutC87-151 change order Robillard•C(—IJ
CHANGE ORDER
Page 1 of 2
(Instructions on reverse side) No. 3
PROJECT: HOOKS BRIDGE REPLACEMENT DATE OF ISSUANCE: August 10 1987
OWNER: EAGLE COUNTY
Board of County Commissioners
(Name, P.O. Box 850
Address) Eagle, CO 81631
CONTRACTOR: CIVIL CONSTRUCTORS, INC.
P.O. Box 3908
Englewood, CO 80155
OWNER's Project No.
C87-151-21
n/a
ENGINEER: ROB ILLARD & ASSOCIATES, INC.
P.O. Box 589
CONTRACT FOR: Silverthorne, CO 80498
Construction of Hooks Bridge Replacement
ENGINEER's Project No. 11151-208
You are directed to make the following changes in the Contract Documents.
Description: 1. Add note to Drawing Sheet 5 of 12 to read "Install 57" x 38" Arch CMP in
accordance with CDOH Standard M-604-1"
2. See attached Page 2
Purpose of Change Order:
To clarify requirements for installing 48" Equiv, corrugated metal pipe arch and
to add provisions for payment to Contractor
Attachments: (List documents supporting change)
CDOH Standard M-604-1 (January, 1982)
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
Original Contract Price
NOrigal Contract Time
$ 333,337.15
days or date
Previous Change Orders No. 1 to No. 2
Net change from revious CVdays
$ n/a
Contract Price prior to this Change Order
Contract Time Prior to this ange Order
$ 33-1-9-337,15
days or date
Net Increase (*Xwpxg� of this Change Order
Net Increase (d ease) of this Change er
$ 1,555-63
days
Contract Price with all approved Change Orders
Cont ct Time with all approved Change Orders
$ 334 , 892-.78
days or date
RECOMMENDED:
by
EJCDC No. 1910-8-B (1983 Edition) � ///ocia
JdGeneral
Prepared by the Engineers' Joint Contract Documents Committee and endor d by The A Contractors of America.
a
CHANGE ORDER
PROJECT: HOOKS BRIDGE REPLACEMENT
C;�
PAGE 2 OF 2
NO. 3
DATE: August 10, 1987
Description (Continued)
2. Add
the following pay items,
quantities,
unit
prices and amount to the
Contract Price:
Item
Description
Qty.
Unit
Unit Price
Amount
206(5)
Structure Excavation
195
C.Y.
$4.62
$900.90
(48" Equiv. CMP Arch)
206(6)
Structure Backfill
22.1
C.Y.
$13.25
$292.83
Class 1
(48" Equi v. CMP Arch.)
206(7)
Structure Backfill
51.7
C.Y.
$ 7.00
$361.90
Class 2
(48" Equiv. CMP Arch.)
3248/42/02