No preview available
HomeMy WebLinkAboutC87-151 change order Robillard•C(—IJ CHANGE ORDER Page 1 of 2 (Instructions on reverse side) No. 3 PROJECT: HOOKS BRIDGE REPLACEMENT DATE OF ISSUANCE: August 10 1987 OWNER: EAGLE COUNTY Board of County Commissioners (Name, P.O. Box 850 Address) Eagle, CO 81631 CONTRACTOR: CIVIL CONSTRUCTORS, INC. P.O. Box 3908 Englewood, CO 80155 OWNER's Project No. C87-151-21 n/a ENGINEER: ROB ILLARD & ASSOCIATES, INC. P.O. Box 589 CONTRACT FOR: Silverthorne, CO 80498 Construction of Hooks Bridge Replacement ENGINEER's Project No. 11151-208 You are directed to make the following changes in the Contract Documents. Description: 1. Add note to Drawing Sheet 5 of 12 to read "Install 57" x 38" Arch CMP in accordance with CDOH Standard M-604-1" 2. See attached Page 2 Purpose of Change Order: To clarify requirements for installing 48" Equiv, corrugated metal pipe arch and to add provisions for payment to Contractor Attachments: (List documents supporting change) CDOH Standard M-604-1 (January, 1982) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price NOrigal Contract Time $ 333,337.15 days or date Previous Change Orders No. 1 to No. 2 Net change from revious CVdays $ n/a Contract Price prior to this Change Order Contract Time Prior to this ange Order $ 33-1-9-337,15 days or date Net Increase (*Xwpxg� of this Change Order Net Increase (d ease) of this Change er $ 1,555-63 days Contract Price with all approved Change Orders Cont ct Time with all approved Change Orders $ 334 , 892-.78 days or date RECOMMENDED: by EJCDC No. 1910-8-B (1983 Edition) � ///ocia JdGeneral Prepared by the Engineers' Joint Contract Documents Committee and endor d by The A Contractors of America. a CHANGE ORDER PROJECT: HOOKS BRIDGE REPLACEMENT C;� PAGE 2 OF 2 NO. 3 DATE: August 10, 1987 Description (Continued) 2. Add the following pay items, quantities, unit prices and amount to the Contract Price: Item Description Qty. Unit Unit Price Amount 206(5) Structure Excavation 195 C.Y. $4.62 $900.90 (48" Equiv. CMP Arch) 206(6) Structure Backfill 22.1 C.Y. $13.25 $292.83 Class 1 (48" Equi v. CMP Arch.) 206(7) Structure Backfill 51.7 C.Y. $ 7.00 $361.90 Class 2 (48" Equiv. CMP Arch.) 3248/42/02