HomeMy WebLinkAboutC87-114 B&B Excavating change order no. 1 to paving programNo. One - Final CHANGE ORDER Dated October 23, 1987 CONTRACTOR B & B Excavating, Inc. Contract For Eagle County Contract Date August 3, 1987 To: B & B Excavating, Inc. Contractor You are directed to make the changes noted below in the subject Contract Nature of the Changes: Eagle County Owner By t : fZZI -,IlleZ-! � 7,/- . Ridhard L. us Dated See Attached Itemized Sheet These changes result in the following adjustment of Contract Price and Contract Time: Contract Price Prior to This Change Order Net (Increase)'9^^*^aG4& Resulting from this Change Order Current Contract Price Including This Change Order M son, xnairman / ,19 $ 161,584.00 $ 23,090.80 $ 184,674.80 Cee - //(,/- Contract Time Prior to This Change Order September 15, 1987 (Days or Date) Net(Increase)(Decrease)Resulting from This Change Order 0 (Days) Current Contract Time Including This Change Order September 15, 1987 (Days or Date The. Above Changes Are Recommended: The Above Changes Are Accepted: M Larry Metternick ENGINEER By Date ,19 L B & B Excavating, Inc. CONTRACTOR By Date , (,'a,�1 g`7 ,19 October 26, 1987 Change Order No. One - Final ITEM NO. DESCRIPTION INCREASE DECREASE 3. 12" Corrugated Steel Pipe $1,500.00 From: 50 @ $30.00/L.F. = $1,500.00 To: 0 @ $30.00/L.F. = $ 0.00 3a. 18" Corrugated Steel Pipe $ 655.35 From: No Item To: Time and Material - 4. 12" Steet End Section $200.00 From: 2 @ $100.00/EA = $200.00 To: 0 @ $100.00/EA = $ 0.00 4a. 18" Steel End Section $ 244.44 From: No Item To: 2 @ $122.22/EA = $244.44 5. Concrete Gutter Pan $ 50.00 From: 154 @ $25.00/L.F. = $3,850.00 To: 152 @ $25.00/L.F. = $3,800.00 6. Utility Trench Patching $ 120.00 From: 230 @ 24.00/S.Y. = $5,520.00 To: 235 @ 24.00/S.Y. = $5,640.00 7. Remove and Replace with Hot $1290.00 Bituminous Pavement (4" Depth) From: 105 @ $ 30.00/S.Y.= $3,150.00 To: 62 @ $ 30.00/S.Y.= $1,860.00 8. Remove and Replace with Hot $ 3577.00 Bituminous Pavement (5" Depth) From: 477 @ $24.50/S.Y.= $11,686.50 To: 623 @ $24.50/S.Y.= $15,263.50 9. Shovel and Lute Surface Patching $ 2934.75 From: 40 @ $105.00/Ton = $4,200.00 To:67.95 @ $105.00/Ton = $7,134.75 10. Manhole Adjustment $ 500.00 From: 7 @ $250.00/EA = $1,750.00 To: 9 @ $250.00/EA = $2,250.00 12. Aggregate Base Course $ 5790.06 From: 500 @ $19.00/Ton= $ 9,500.00 To:804.75 @ $19.00/Ton = $15,290.06 13. Tack Coat, CS5-lh or ss -1h, diluted $ 370.50 From: 1,825 @ $1.50/Gal = $2,737.50 To: 2,072 @ $1.50/Gal = $3,108.00 GZo - sT g TOTAL INCREASE= M $6,275.50 $13,807.15 $ 3,872.05 $ 535.00 $32,406.30 $9,315.50 $23,090.80 14. Hot Bituminous Pavement Leveling Course (Grading Ex), Complete in Place From: 834 @ $35.00/Ton = $29,190.00 To: 654.7 @ $35.00/Ton = $22,914.50 15. Hot Bituminous Pavement Surface Course (Grading Ex), Complete in Place From: 1900 @ $35.00/Ton= $66,500.00 To:2294.49 @ $35.00/Ton= $80,307.15 16. Shoulder Gravel (Class 4) From: 450 @ $23.00/Ton = $10,350.00 To:618.35 @ $23.00/Ton = $14,222.05 18. Place Topsoil From: No Item To: Time and Material GZo - sT g TOTAL INCREASE= M $6,275.50 $13,807.15 $ 3,872.05 $ 535.00 $32,406.30 $9,315.50 $23,090.80