NAME OF AIRPORT EAGLE COUNTY
CONTRACTOR CORN PAVING COMPANY
_�r 1
-87-102-17
AIP PROJECT NO.3-08-0020-05 & 06
LOCATION EAGLE, COLORADO
SCHEDULE NO. I
CHANGE ORDER NO. 5
TO CORN PAVING COMPANY CONTRACTOR:
YOU ARE HEREBY ORDERED TO MAKE THE FOLLOWING CHANGE IN THE PLANS AND/OR
SPECIFICATIONS FOR THE ABOVE DESIGNATED PROJECT.
1. DESCRIPTION OF CHANGE TO BE MADE:
Compensate Contractor for costs incurred in cable trenching
prior to issuance of Change Order No. One.
2. REASON FOR ORDERING CHANGE:
The Contractor had commenced trenching for for the L-824 Cable
installation prior to the initial approval of Change Order No.
One. Direction given, per. Change Order No. One, resulted in
this work effort to be backfilled and excavated a second time.
As the Contractor agreed to do the extra work in good faith,
it is felt that he should be compensated for this
additional work that was inadvertently overlooked by -
Change Order No. One.
3. SETTLEMENT.FOR THE COST OF THE ABOVE MENTIONED CHANGE TO BE MADE AS
FOLLOWS:
See attached sheet.
THIS CHANGE ORDER (INCREASES)fBEeREAsH-} THE CONTRACT TIME BY 0 CALENDAR
DAYS.
4. SUMMARY OF COSTS:
NET (INCREASE)fBE2RHAsE} OF THIS CHANGE ORDER $ 1,250.00
TOTAL (INCREASE){DEeRHASH} OF ALL PREVIOUS CHANGE ORDERS $449,680.40
TOTAL (INCREASE)4BH2RHASE} OF ALL CHANGE ORDERS TO DATE $450,930.40
TOTAL ESTIMATED PROJECT COST $2,564,411.81
NOTE: THIS ORDE IS N T EFFECTIVE UNTIL SIGNED BY THE ENGINEERING
SECTION RPORTS IVISIPN FEDERAL AVIATION ADMINISTRATION.
AGREED TO BY:
AGREED TO BY:
APPROVED BY:
Izi -•N •- O
r0m'i"W-A•;
ENGINEERING
ZEDP. TI
ZED REP.' -
TITLE
'k
ION, AIRPORTS DIVISION,
)- I , 1917
DATE
DATE
197
A
(INCREASE)JBEeREASE} - STRIKE OUT THE ONE WHICH DOES NOT APPLY.
x
r1-4
�,
COST ESTIMATE FOR CHANGE ORDER NO. 5
EAGLE COUNTY AIRPORT
EAGLE, COLORADO
MAY, 1987
Item
Estimated
No. Description Quantity Unit
------------------------------------------------------
L-108b Cable Trench 2,500 L.F.
TOTAL COST - CHANGE ORDER #5
�
Unit Total
Price Price
-----------------------
.50 $1,250.00
-------------
$1,250.00