HomeMy WebLinkAboutC87-093 Chen & Associates El Jebel Hill road improvementsSUGGESTED MOTION
Move that the Board of County Commissioners award proposal for
Pro nal Services, Construction Observation and Testing for
J E1 Jebel Hi o�o Chen & Associates in the lump sum amount
of $7, 8.00.
�Fm
—,irl7Q�
A AN 2 � d
5080154
Chen &Associates Glen Road
Glenwood Springs, CO 81601
Consulting Geotechnical Engineers 303/945-7458
C87-93-54
Casper
Colorado Springs
Denver
Fort Collins
Rock Springs
Salt Lake City
San Antonio
May 22, 1987
Subject: Proposal for Professional
Services, Construction
Observation and Testing,
El Jebel Hill Road
Improvements,
Eagle County, Colorado.
RFP 4 87 05 04
Eagle County Engineering Department
P.O. Box 850
Eagle, CO 81631
Attn: Susanna Struble
Dear Susanna:
As requested, Chen & Associates is pleased to provide a cost
estimate for compaction and asphalt testing for the proposed El
Jebel Hill Road Improvements. The improvements are to consist of
new roadway widening and realignment, and pavement construction
on two miles of the road. We previously performed a subsoil
study for site grading and pavement design of the project,
submitting our findings to you in a report dated November 26,
1987, Job No. 4 407 86.
From our discussion with you regarding the project, we under-
stand the assumed construction time for the earthwork and base
course placement will be about 1 1/2 months. The testing is to
be on a part-time daily basis. We submit the following estimate
for our services:
Compaction Testing -Soils (Assume 5 weeks)
Technician: 25 trips
(3 hours per
trip)
_ $2650
Proctor Tests: 4 at
$147 each
= 588
Subtotal
3238
Compaction Testing -Base Course
(Assume
1 week)
Technician: 5 trips
(3 hours per
trip)
= 530
Proctor Test: 1 each
at $115
= 115
Subtotal
$ 645
Eagle County
May 22, 1987
Page 2
u
Engineering Department
Asphalt Testing (Assume 1 week)
Technician: 5 trips, 8 hours/day = 1310
Coring: 5 days, 2 hours/day at $60/hr. = 600
Marshall Test, 1 per day: 5 at $125/each 625
Extraction/Gradation, 1 per day: 5 at $90/ea. _ 5
Subtotal $2985
Engineering Review of Daily Reports and Report Typing
Engineer: 2 hr•s/wk, x 7 weeks at $45/hr. = 630
Word Processing: 2 hrs/wk, x 7 weeks at $25/hr. _ 5
Subtotal $ 980
Estimate Total $7848
Since the actual time and required testing for the job will
be dependent primarily on the construction schedule and materials
encountered, we propose our fees be based on unit costs in accor-
dance with the attached Fee Schedule. We will keep our costs to
a minimum, consistent with providing adequate testing services.
To reduce costs, we will split travel time and mileage with other
jobs in the area when possible. We expect to be in the area most
of the construction season.
If this proposal meets with your approval, please sign one
copy and return it to this office. If you have any questions,
don't hesitate to call. We look forward to working with you on
the project.
DAY/ec
Attachment
Rev. By: S.L.P.
Agreed to this day of
(Organiz#ion
Chen &Associates
Sincerely,
CHEN & ASSOCIATES, INC.
By _a-, �4� 7,
David A9`�(J ung
1987.
Effective: January 1. 1987
CHEN & ASSOCIATES, INC. Eagle Cty, Engineering Dept
GLENWOOD SPRINGS, CO E1 Jebel Hill Road
CONSTRUCTION OBSERVATION AND MATERIALS TESTING
FEE SCHEDULE
CONSTRUCTION OBSERVATION
Field Technician - Soils, Asphalt, Roofing, Fireproofing
Trip Charge (up to 2 hours)....:................................................................... $70.00/trip
(over 2 hours)......................................................................... 30.00/hr.
Field Technician - Concrete
Trip Charge (up to 2 hours ........................ $60.00/trip
(over 2 hours)......................................................................... 25.00/hr.
Overtime (overtime 8 hours per day, Saturday, Sunday and Holidays) ............................... 1.25 x Standard Hourly Rate
Senior Technician - Piers, Steel.......................................................................
37.00/hr.
Supervisor............ ..................................................................
***,,*,. 44.00/hr.
Engineer.................................................................................
$42.00 to 82.00/hr.
Draftsperson............................................................................*,,,,**,.
30.00/hr.
WordProcessing...............................................................................**,
25.00/hr.
Construction observation rates include all necessary field equipment.
LABORATORY TESTING
$ 3.50
SOILS
$ 60.00
Moisture Content and Density (ASTM D-2216)
....... $ 7.50
Atterberg Limit (ASTM D-4318) ....................32.00
Specific Gravity (ASTM D-854) ....................25.00
125.00
Gradation Analysis (ASTM D-422)
a. Less than #4 Sieve Down to #200 Sieve
.........25.00
b. All Standard Sieves to #4 Sieve, add ...........15.00
c. Hydrometer Analysis, add ...................17.00
d. Percent Less than #200 Sieve ................12.50
350.00
Standard Proctor Compaction (ASTM D-698) ..........65.00
Modified Proctor Compaction'(ASTM D-1557)
.........75.00
Check Point Proctor ...........................25.00
......12.50
Relative Density (ASTM D-4253 and D-4254) ..........88.00
ASPHALT
$ 3.50
Extraction Only (ASTM D-2172) .................
$ 60.00
Extraction/Gradation (ASTM D-2172) ...............90.00
Marshall Test - 3 Specimens (ASTM D-1559)
Unit Weight, Stability, Flow and Air Voids ..........
125.00
Asphalt Retention .............................60.00
Stripping Test (ASTM D-1664) ....................80.00
Asphalt Coring, Includes Technician .................60.00/hr
Marshall Mix Design - 4 Points (ASTM D-1559)
Aggregate Testing Not Included ................
350.00
Hveem Mix Design (ASTM D-1560, D-1561)
Aggregate Testing Not Included ................
475.00
Specific Gravity, Bulk (ASTM 0-1188 and D-2726)
......12.50
CONCRETE
$ 3.50
Cylinder Compression Test (ASTM C-39) ............10.00
(Cast by Others) .............................19.00
Grout Block Compression Test, Including Coring .......20.00
Mortar Cube Compression Test ....................7.00
Masonry Prism Compression Test
a. Hollow Cell .............................40.00
b. Grout Filled .............................50.00
Beam Flexural Test (ASTM C-78) ..................20.00
Concrete Coring (ASTM C-42), Includes Technician .....60.00/hr
Trim Core, Unit Weight and Compression Test .........19.00
Concrete Mix Design (Aggregate Testing Not Included)
a. Concrete ..............................
200.00
b. Mortar ..............................100.00
Unit Weight (6x12" Cylinder - dry) .................15.00
AGGREGATES
Moisture Content (ASTM D-2216) .................
$ 3.50
Gradation, Large Pit Run Samples ...................30.00/hr.
All Standard Sieves to #200 Sieve (ASTM C-36)
a. Coarse Aggregate ..........................35.00
b. Fine Aggregate ............................25.00
c. Percent Less than #200 Sieve ..................12.50
Clay Lumps and Friable Particles (ASTM C-142)
Coarse or Fine Aggregate .......................25.00
Flat and Elongated Particles
(Army Corps of Engineers, CRD -C119) ..... . ........55.00
Fractured Faces, Coarse Aggregate
(Colorado Procedure 45) ........................45.00
Lightweight Particles (ASTM C-123)
Coarse or Fine Aggregate .......................45.00
Los Angeles Abrasion
a. 1112" Maximum (ASTM C-131) 500 Rev. ...........75.00
b. 3" Maximum (ASTM C-535) 1000 Rev. ...........85.00
Organic Impurities, Fine Aggregate
(ASTM C-40) .................................12.00
Sand Equivalent (ASTM D-2149) ....................35.00
Scratch Hardness, Coarse Aggregate
(ASTM C-851) ..............................30.00
Sodium or Magnesium Sulfate Soundness
(5 Cycles - ASTM C-88)
Coarse or Fine Aggregates ......................
115.00
Freeze/Thaw Soundness
(AASHTO T-103) ................. $480.00 to $1500.00
Unit Weight and Voids (ASTM C-29) .................15.00
Specific Gravity, Bulk and Apparent
Coarse (ASTM C-127) .........................20.00
Fine (ASTM C-128) ..........................
25.00
Laboratory Technician .......................... $30.00
Special Testing Prices on Request
OTHER DIRECT CHARGES
Auto or Pickup......................................................................... $20.00/day + 0.30/mile
4 -Wheel Drive Vehicle.................................................................:.. $25.00/day+ 0.40/mile
Out-of-town Living Expenses, Commercial Travel Costs, Equipment Rental, etc .................................... Cost + 20%
Soils Field Laboratory Equipment..................................................................... $25.00/day
Concrete Field Laboratory Equipment................................................................. $100.00/day
Asphalt Field Laboratory Equipment................................................................... $75.00/day
Interest charged after 30 days from invoice date ....................................................... 1112% per month